Similar Projects
FMTC Running Track Lighting
Infrastructure
Bidding
$35,000 CJ est. value
Montgomery, AL 36104

Municipal Road Improvements - Re-Paving Improvements (2022 Rebuild Alabama)
Infrastructure
Bidding
$300,000 CJ est. value
Wadley, AL 36276

Concrete Pipe
Term Contract
Sub-Bidding
Montgomery, AL 36104

District Five Southside Park Concrete Pad Project
Post-Bid
Huntsville, AL 35803

Annual Class III Reinforced Circular Concrete Pipe
Term Contract
Post-Bid
AL

Fire Station 16 (Lathan)- Concrete Apron Replacement
Results
$36,500 est. value
Mobile, AL 36605

Reinforced Concrete Pipe
Results
Phenix City, AL

Fiber Reel Concrete Slab
Alteration
Post-Bid
Huntsville, AL

City-Wide Concrete Work For Sidewalks-Curbing, Ada Ramps Inlets and Structures
Results
$100,000 to $150,000 est. value
Fairhope, AL

Concrete Pads
Alteration
Post-Bid
Mobile, AL 36628

Brkr212001 Construct Maintenance Pad
Term Contract
Results
$25,000 to $100,000 est. value
Birmingham, AL 35212

Ready Mix Concrete "Class A"
Term Contract
Post-Bid
Guntersville, AL

Centrifugally Cast Reinforced Decorative Concrete Poles
Alteration
Results
Dothan, AL

General Concrete and State Certified Concrete Mix
Term Contract
Post-Bid
AL

Materials Bid for Masonry and Concrete Work for ADA Compliance Project
Alteration
Results
$22,274 est. value
Fairhope, AL

Last Updated 08/25/2022 02:33 PM
Project Title

Ridgecrest Remediation of Burn Unit #66

Physical Address View project details and contacts
City, State (County) Auburn, AL 36830   (Lee County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK/TECHNICAL SPECIFICATIONS. The Agency is seeking bids from qualified, licensed, and insured entities to provide the following detailed construction services: 2.1 Specific Scope of Work. The work shall consist of furnishing all labor, materials, and equipment to complete the Fire Unit construction work located at 66 Booker Street, Auburn, AL 36830, as specified herein, and most especially as detailed within Attachment H, attached hereto. 2.2 Contractor Responsibilities (in alpha order). 2.2.1 Access for Emergency Vehicles. The Contractor shall ensure that any equipment and/or vehicles that he/she places on the work site shall not be placed in such a position to interfere with access by any emergency vehicles or traffic by the public at-large. The Agency reserves the right to approve or reject (and demand the movement) of the placement of any such equipment or vehicles at any time during the performance of the contracted work if, in the opinion of the Agency, the placement of such equipment or vehicles does interfere with such traffic. 2.2.2 As-built Record Documents. Do not use Record Documents for construction purposes; protect from loss in a secure location; provide access to Record Documents for the Agency's reference. 2.2.2.1 If issued, maintain a clean, undamaged set of blue or black line white-prints of Contract Drawings and Shop Drawings. Mark-up these drawings to show the actual installation. Mark whichever drawing is most capable of showing conditions accurately. Give particular attention to concealed elements that would be difficult to measure and record at a later date. 2.2.3 Communication. The Agency shall be the primary on-site point of contact for the Contractor pertaining to this work. The Contractor shall be free to converse and communicate with the Agency during or between visits; however, all requests for changes or decisions shall be submitted to the Agency and approved by the Executive Director after receipt and consideration of written request from the Agency. The Agency anticipates that it will typically make a decision in such matters within 3 workdays of receipt, though such response time-frame may be shorter or longer depending on the situation; accordingly, the Contractor shall be required to submit such written requests in as timely a manner as reasonably possible. When construction commences, all communication must be directed to the designated Agency contact person only.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents