Similar Projects
S-96 Rehabilitation
Renovation
Results
$2,784,130 est. value
FL

Lake Pretty Structure Replacement
Results
Less than $200,000 est. value
Odessa, FL 33556

Phase II Repairs to Lake Manatee Dam
Renovation
Post-Bid
$20,000,000 est. value
Bradenton, FL

Wetland Outfall Weirs and Valves
Infrastructure
Results
Melbourne, FL 32940

Flood Gate Submersible Panel Replacement (Rivera Drive)
Renovation
Results
Coral Gables, FL 33114

Tsala Apopka Golf Course Control Structure Modification
Results
$500,000 est. value
Inverness, FL 34450

Structures - S-160 and S-163 Gate Refurbishment Support
Results
$500,000 to $999,000 est. value
Tampa, FL 33610

Myakka River State Park - Upper Lake Restoration
Renovation
Results
Sarasota, FL 34241

Knowles Crossing
New Construction, Infrastructure
Results
$75,000 est. value
Clewiston, FL 33440

Knowles Crossing
New Construction, Infrastructure
Results
$75,000 est. value
Clewiston, FL 33440

Salinity Barrier Improvements
Results
Jupiter, FL

Water Control Structure (WCS) No.108 Replacement
New Construction
Results
$3,085,115 est. value
North Port, FL

Hillsborough River Dam North Embankment Remediation
Results
$517,080 est. value
FL

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Lake Apopka Duda Water Storage Improvements
Results
Less than $2,389,000 est. value

Last Updated 10/22/2021 04:20 PM
Project Title

Willowbrook Lake Dam Stabilization

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32534   (Escambia County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The intended outcomes of this project are the repair and upgrade of the dam. Notable items to be addressed within this project include, but are not limited to the following items: 1) Remove all sediment and debris from within the outfall pipes. 2) Remove and replace damaged armoring around the emergency spillway. 3) Fill, regrade, sod, and replace underdrain within the scour areas around the emergency spillway. 4) Fill, grade, and replace armoring at the U-Wall energy dissipater. 5) Fill, grade, and sod at the box culvert wingwalls. 6) Remove sediment, grade, and replace riprap along the stilling basin. 7) Remove sediment from the box culvert.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents