Similar Projects
Open-end Contract for Pressure Piping, Fabrication and Install Projects
Renovation
Sub-Bidding
$170,000 CJ est. value
Vineland, NJ 08360

River Vale Country Club Bathrooms Barrier-Free Improvements
Renovation
Sub-Bidding
$80,000 CJ est. value
River Vale, NJ 07675

Plumbing Services
Term Contract
Post-Bid
Beach Haven, NJ

Plumbing, Maintenance, Installation and Repair
Term Contract
Post-Bid
Newark, NJ

Bee Meadow Pool Facility Column Shower Replacement
Alteration
Results
Whippany, NJ

Kitchen, Bathroom and Plumbing Improvements
Alteration
Results
Bayonne, NJ 07002

Plumbing Services District Wide (T&M)
Term Contract
Post-Bid
Paterson, NJ

Replacement of Kitchen Grease Interceptor - Juvenile Medium Security Facility (JMSF) North, JJC Johnstone Campus
Alteration
Results
$168,940 est. value
Fieldsboro, NJ 08505

On-Call Licensed Plumber
Alteration
Post-Bid
NJ

Plumbing Services
Term Contract
Results
Toms River, NJ

Plumbing/HVAC Repair and Maintenance
Term Contract
Post-Bid
Newton, NJ

Supplying Plumbing and Waterworks Specialties
Alteration
Results
Randolph, NJ

General Plumbing Work
Alteration
Post-Bid
Garfield, NJ

Plumbing Services
Term Contract
Results
Newark, NJ

General, Electrical, Plumbing, Building & Yard Emergency Services At LNA Service Stations
Term Contract
Post-Bid

Last Updated 06/23/2023 01:01 AM
Project Title

Pine Street Improvements

Physical Address View project details and contacts
City, State (County) Chatham, NJ 07928   (Morris County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $173,987 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each bidder must submit with his bid a signed certificate stating that he owns, leases or controls all the necessary equipment required to accomplish the work shown and described in the Contract Documents. Should the bidder not be the actual owner or leasee of such equipment, his certificate shall state the website. Bidders must use the prepared bid form which is contained in the Contract Documents. Each individual proposal must be separately enclosed in a sealed envelope addressed to the Township Clerk, 158 Meyersville Road, Chatham, New Jersey 07928 marked on the outside with the number of the contract(s) and name of the project being bid on. The Owner will tabulate the bids and any award will be made to the lowest responsible bidder in accordance with N.J.S.A. 40A:11-4. The Owner reserves the right to reject all bids pursuant to N.J.S.A. 40A:11-13.2. The work includes the furnishing of all labor, materials and equipment necessary to complete the work as shown on the Drawings and as described in the Specifications. The work consists of watermain replacement milling, paving, and general road maintenance work, including curb and storm basin repairs. The work is located along Pine Street within the Township of Chatham and includes: milling, paving, drainage, site work and general construction. The bid shall be accompanied by a Certificate of Surety on the form included in the Contract Documents, from a surety company licensed to do business in the State of New Jersey, which shall represent that the surety company will provide the Contractor with the required bonds in the sums required in the Contract Documents and in a form satisfactory to the Owner's Attorney and in compliance with the requirements of law. No bids will be received after the time and date specified, and no bids will be received by mail. Bids shall be received by courier service (date and time recorded) or shall be hand delivered. The Owner shall award the Contract or reject all bids within 60 days of bid opening, except that the bids of any bidders who consent thereto may, at the request of the Owner, be held for consideration for such longer period as may be agreed. All bid security except the security of the three apparent lowest responsible bidders shall be returned, unless otherwise requested by the bidder, within ten (10) days after the opening of the bids, Sundays and holidays excepted, and the bids of the bidders whose bid security is returned shall be considered withdrawn. NOTICE is hereby given that sealed bids will be received by the Township of Chatham (hereinafter called the "Owner") for: PINE STREET IMPROVEMENTS website Pursuant to N.J.S.A. 52:32-44, all business organizations that conduct business with a New Jersey government agency are required to be registered with the State of New Jersey. Bidders and their subcontractors must submit proof that they are registered with the New Jersey Department of Treasury, Division of Revenue by submitting a copy of their Business Registration Certificate prior to Contract award. Bidders and their subcontractors of any tier must comply with all applicable provisions of the Public Works Contractor Registration Act (N.J.S.A. 34:11-56.48) and the New Jersey Prevailing Wage Act (N.J.S.A. 34:11! 56.25). P.L. 2021, c. 301 requires that if a Contract is subject to the Prevailing Wage Act and the contractor submitting the lowest bid for a Contract is 10 percent (or more) lower than the next lowest bid, the bidder must certify to the public body that the prevailing wage rates required by the Act shall be paid. If the Bidder does not provide the certification prior to the award of the contract, the public body will award the Contract to the next lowest responsible and responsive Bidder. Further, P.L. 2021, c. 301 also amended N.J.S.A. 34:11-56.27 to require that any Contract for public work expressly stipulate that workers performing work under the contract shall not be paid less than the required prevailing wage rate. Contractors and their sureties shall be liable to the public body, any lessee to whom the public body is leasing a property or premises or to any lessor from whom the public body is leasing or will be leasing a property or premises, for any excess costs occasioned by the termination of their right to proceed with the work, or such part of the work as to which there has been a failure to pay required wages. Pursuant to N.J.S.A. 10:5-31 et seq., bidders are required to comply with the requirements of N.J.A.C. 17:27. Each Bidder must submit with his bid an "Ownership Disclosure Statement" and is requested to submit with his bid the "Non-Collusion Affidavit" on the forms included in the Contract Documents. Bidders are required to comply with all relevant Federal and State Statutes, Rules and Regulations including but not limited to the applicable provisions of Title VI of the Civil Rights Act of 1964, as amended (42 USC 2000d-2000D-4A), the discrimination and affirmative action provisions of N.J.S.A. 10:2-1 through 10:2-4, the New Jersey Law against Discrimination, N.J.S.A. 10:5-1, et seq., the rules and regulations promulgated pursuant thereto, the State requirement for bidders to supply statements of ownership (N.J.S.A. 52:25-24.2) and the State requirement for submission of the names and addresses of certain subcontractors (N.J.S.A. 40A:11-16). The Contract Documents may be obtained by any prospective bidder upon payment of a fee for each set of full-sized drawings with specifications by calling 1-877-424-3738 or by online request. Shipping charges are additional and variable depending upon the pick-up or delivery option selected by the purchaser. Bid documents cannot be obtained at the Chatham Township Municipal Building or at Mott MacDonald's office. The printing cost is not refundable. It is the purpose of this Notice to Bidders to summarize some of the more important provisions of the Contract Documents. Prospective bidders are cautioned not to rely solely on this summary, but to read the Contract Documents in their entirety. 05/06/2023, 18:17 Title Case Converter Tool | Capitalize My Title | Convert Case source from which the equipment will be obtained and, in addition, shall be accompanied by a signed certificate from the owner or person in control of the equipment definitely granting to the bidder the control of the equipment required during such time as may be necessary for the completion of that portion of the Contract for which it is necessary. The bidder shall comply with the documentation requirements set forth in the Article of the Information.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents