Similar Projects
Downtown Street and Sidewalk Repair - City Of Marshalltown
Infrastructure
Design
$1,500,000 CJ est. value
Marshalltown, IA 50158

Miscellaneous - Various Location
Infrastructure
Bidding
$3,500,000 CJ est. value
Melbourne, IA 50162

Gilman 2023 Street Maintenance Project
Infrastructure
Bidding
$50,000 CJ est. value
Gilman, IA 50106

Elk's Park Grading and ADA Accessibility
Infrastructure
Post-Bid
$92,851 est. value
Marshalltown, IA

South Street Water Main Replacement
Infrastructure
Post-Bid
$850,040 est. value
Marshalltown, IA 50158

South Street Water Main Replacement
Infrastructure
Results
$866,095 CJ est. value
Marshalltown, IA 50158

South Street Water Main Replacement
Infrastructure
Results
$866,095 CJ est. value
Marshalltown, IA 50158

Lead Based Paint Remediation - 112 North 4th Street
Term Contract, Infrastructure
Post-Bid
Marshalltown, IA 50158

Wastewater Treatment System
Infrastructure
Results
$867,850 CJ est. value
Green Mountain, IA 50158

Lead Based Paint Remediation - 307 Lee Street
Term Contract, Infrastructure
Post-Bid
Marshalltown, IA 50158

Headworks and Digester Improvements
Renovation, Infrastructure
Results
$8,939,000 CJ est. value
Marshalltown, IA 50158

Lead Based Paint Remediation - 308 North 2nd Street
Term Contract, Infrastructure
Post-Bid
Marshalltown, IA 50158

City of Le Grand Public Improvement Project
Infrastructure
Results
$284,840 CJ est. value
Le Grand, IA 50142

Timmons Grove Shower House and Septic System Improvements
New Construction, Infrastructure
Post-Bid
$85,000 CJ est. value
Marshalltown, IA 50158

Legrand 2023 Street Maintenance Projects
Infrastructure
Post-Bid
$400,000 CJ est. value
Le Grand, IA 50142

Last Updated 07/12/2023 02:20 PM
Project Title

Water Metering Equipment Changeout 2023

Physical Address View project details and contacts
City, State (County) Marshalltown, IA 50158   (Marshall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,269,078 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Furnishing all labor, equipment, and materials to implement the Water Metering Equipment Changeout 2023 project, which consists of: 1. Furnishing and installing an Automated Mobile Reading (AMR) system that is capable of being installed as a mobile system and later migrating to fixed network. The selected network shall utilize a fully two-way Mobile Transceiver to read and communicate/transmit to metering devices and include all software required to interface with Owner's billing system. 2. Furnishing radio transmitters for the complete inventory of Owner's water meters (10,484 in total with sizes ranging from 5/8" x 3/4" to 10" diameter as shown in the Bid Form). 3. Furnishing new water meters equipped with encoder registers, including installation of approximately 35 meters in locations to be selected by Owner for training purposes. 4. Furnishing new water meters to replace the Owner's entire inventory (10,484 in total with sizes ranging from 5/8" x 3/4" to 10" diameter as shown in the Bid Form) over the duration of the contract as project budget allows. 5. Additional water meter installations may be approved following the successful implementation of the proposed AMR system, or as needed to ensure compatibility with the proposed manufacturer's meter reading system. 6. All other work as required by the contract documents. Work on the improvement shall commence within 30 days after the Effective Date of the Contract, or on the day indicated in the Notice to Proceed. The Notice to Proceed will be issued upon approval of the contract and bonds by the City Council and be completed as stated below. The work shall be substantially completed on or before May 31, 2027, and the work shall be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before June 30, 2027. Failure to meet either the Substantial Completion date or Final Completion date will result in liquidated damages of $500.00 per calendar day A pre-bid conference for the Project will not be held

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents