Similar Projects
Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Construction
Anaheim, CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Martin Slough Flow Enhancement Project
Alteration
Post-Bid
Eureka, CA 95503

CA-Stone Lakes NWR-Pumps Rehab
Term Contract
Results
Elk Grove, CA

Install Chill Water Pumps
Term Contract
Post-Bid
CA 95652

Well Abandonment Project
Infrastructure
Results
Riverside, CA 92519

Big Horn Groundwater Well 7 Downhole Construction
Infrastructure
Post-Bid
$1,280,000 est. value
Elk Grove, CA 95757

Drilling of Water Wells North Long Beach 13 and North Long Beach 14
Infrastructure
Results
$4,486,918 est. value
Long Beach, CA 90899

Reported 04/01/2022 12:00 AM
Project Title

6-Inch Self-Priming Trailer Mounted Pump

Physical Address View project details and contacts
City, State (County) Hemet, CA 92545   (Riverside County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Metropolitan Water District of Southern California is soliciting bids from a qualified and experienced Contractor to provide (2) 6-Inch Self-Priming Trailer Mounted Pumps, in accordance with the specifications, terms and conditions contained herein.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents