Similar Projects
Design, Fabrication, and Furnishing of Metal Railings for Diamond Hill Park
Bidding
Cumberland, RI 02864

Exterior Improvements to Knotty Oak Village
Post-Bid
Coventry, RI 02816

Glen Manor House - New Awning And New Roll Curtains
Post-Bid
Portsmouth, RI

Siding And Trim Replacement At West Warwick Manor
Results
$30,000 to $45,000 est. value
West Warwick, RI 02893

Hannaway Blacksmith Shop Exterior Repairs and Painting
Results
Lincoln, RI 02865

Installation of Bird Deterrent System
Post-Bid
Less than $25,000 est. value
Newport, RI

Main Street Rhode Island Streetscape Business Storefront Improvement Grant - Storefront Facade Improvement
Results
Providence, RI

Storage Building Roof Safety Rail
Post-Bid
Providence, RI 02905

Springbrook Stair Railing Replacement and Facade Restoration
Results
Less than $35,000 est. value
Westerly, RI

On-Call Replacement of Shelter Glass
Post-Bid
Providence, RI 02907

Esek Hopkins Homestead Restoration Project
Results
Providence, RI 02904

Concrete Wall Replacement
Post-Bid
Woonsocket, RI 02895

Removal and Replacement of a Flagpole
Results
$25,000 to $100,000 est. value
Newport, RI 02841

Lincoln Manor - Exterior Improvements
Post-Bid
Lincoln, RI 02865

Stair Tread Upgrade - CCRI Knight Campus
Results
Warwick, RI 02886

Last Updated 10/23/2020 10:43 AM
Project Title

Exterior Building Envelope Repairs to the Administration/Maintenance/Community Building

Physical Address View project details and contacts
City, State (County) Woonsocket, RI 02895   (Providence County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $755,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for completing Exterior Building Envelope Repairs to the Administration/Maintenance/Community Building Apartment Buildings #1, 2, 3 at Morin Heights, RI 3-1 housing development. The work generally includes, but is not limited to the following: Administration/Maintenance/Community Building: All exterior surfaces of the entire building shall be power-washed, scraped, sanded, primed and painted with two (2) coats of paint, including, but not limited to existing shiplap siding, CMU, brick, concrete foundation, wood trim, window frames, window security frames, handrails, louvers, doors, frames, etc. Replace deteriorated, and/or prep./paint metal doors/frames/hardware. Prep./paint existing (and/or replace) shiplap wood siding and wood trim. Prep./paint existing CMU and masonry. Replace existing deteriorated wood siding and trim. Replace portions of existing faux parapet with PVC components. Lead-based paint abatement methods will be required at all wood components which have tested positive for the presence of lead. Apartment Buildings 1, 2 and 3: In general, all existing fiber-cement siding shall be replaced with new solid PVC siding; all existing fiber-cement trim shall be replaced with new PVC trim; all existing PVC trim shall remain in place; all existing aluminum-wrapped (upper/2nd level) soffits, fascia, rakes shall remain in place. Field verify all conditions prior to submitting bid. Replace all existing fiber-cement siding and trim boards with new solid PVC siding. Replace asphalt shingles on lower canopy roofs and associated flashings over front and rear entrance doors.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Siding.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents