Similar Projects
Parkview Place - Phase 2
New Construction
Conception
Sanford, FL

Dollar Tree
Build-Out - 10,000 SF
Conception
Winter Springs, FL

Fairfield Inn & Suites/North Point Hotel and Restaurant
New Construction - 33,032 SF
Design
Lake Mary, FL 32746

Huey Magoo's Oviedo
New Construction
Design
Oviedo, FL 32765

Harvest Time International / Sanford
New Construction, Infrastructure - 32,015 SF
Sub-Bidding
$10,000,000 CJ est. value
Sanford, FL 32771

Chipotle - Shell
New Construction - 2,405 SF
Post-Bid
$750,000 est. value
Winter Springs, FL

Papa John's
Renovation - 1,490 SF
Post-Bid
Sanford, FL 32771

Resurfacing Drainage Improvements Concrete Pavement - SR 419
Infrastructure
Results
$4,183,639 est. value
FL

Milling and Resurfacing - Resurface and Safety Improvements Seminole XWAY MP 44.5-49.9
Infrastructure
Results
$12,288,432 est. value
FL

Chick-fil-A #0581
New Construction - 4,838 SF
Construction
$850,000 to $950,000 est. value
Winter Springs, FL 32708

Food Factory
New Construction - 14,000 SF
Construction
$2,200,000 est. value
Oviedo, FL 32765

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

Kentucky Square
New Construction, Infrastructure
Pending Verification
$58,300,000 CJ est. value
Sanford, FL 32773

Brent's Landing
New Construction - 73,112 SF
Conception
Lake Mary, FL

Red Cleveland Boulevard Gas Station & Convenience Store
New Construction - 8,150 SF
Design
Sanford, FL

Last Updated 01/11/2023 11:08 AM
Project Title

Broadstone Mixed Use Development

Physical Address View project details and contacts
City, State (County) Sanford, FL 32771   (Seminole County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the new construction of retail and restaurant space on 4 lots on 5.02 acres at southwest corner of the intersection. Scope details have not been released. As of January 11, 2023 the project is in planning stage and seeking a restaurant site plan approval from the Seminole County Development Review Committee. A meeting is scheduled for January 11, 2023. Approval is anticipated to be completed in the first quarter of 2023. The county Planning and Zoning Commission approved a preliminary subdivision plan August 3, 2022. Information regarding the architect, general contractor and method of selection has not been disclosed. The owner may opt to do build to suit for end users. A construction timeline has not been determined, but is not expected to begin before the spring of 2023.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents