Similar Projects
2021 NWLSD Sanitary Sewer Improvements
Infrastructure
Bidding
Lakewood, CO

Construction of the East 69th Avenue Forcemain
Post-Bid
Denver, CO 80229

Non-Destructive Excavating, Potholing, Hydro-Jetting and Vacuuming
Post-Bid
Denver, CO 80204

Force Main and Siphon Condition Assessment and Cleaning
Results
Denver, CO 80229

Interceptor Rehabilitation 2020 - 2022
Results
CO

FNS Sanitation System
Term Contract
Post-Bid
CO

Sewage Ejectors Ellie Caulkins
Results
Denver, CO 80204

East 64th Avenue and Denali Street Infrastructure Project
Post-Bid
Denver, CO 80202

High Point Possum Gully Sanitary Sewer
Results
Denver, CO

Transmission System Structure Rehabilitation
Post-Bid
Denver, CO 80229

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

Public Improvements within Phase 2 of The Point Redevelopment Project
Post-Bid

R3 S6 Sand Trap Cleaning
Results
Denver, CO 80204

Sanitary Sewer Lines Replacement
Alteration
Post-Bid
Less than $180,000 est. value
Denver, CO 80204

Tunnel Sewer Repairs
Results
Denver, CO

Last Updated 07/26/2021 06:36 PM
Project Title

2021 Preventive and Critical Lining

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000 to $3,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to rehabilitate approximately 92,000 linear feet of deteriorated sewer pipes in the City and County of Denver using Cured in Place Pipe (CIPP) technology. The rehabilitation of pipelines shall be done by the installation of a resin-impregnated flexible tube which, when cured, shall be continuous and tight-fitting throughout the entire length of the original pipe. The CIPP shall extend the full length of the original pipe and provide a structurally sound, jointless and water-tight new pipe-within-a-pipe. The Contractor is responsible for proper, accurate and complete installation of the CIPP using the system selected by the contractor meeting the City’s requirements. Most of the work will be located in council districts 3 and 8, with minor work in districts 1 and 9.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents