Similar Projects
Last Updated | 04/24/2020 09:20 AM |
Project Title | Bridge Elimination |
Physical Address | View project details and contacts |
City, State (County) | PA (Chester County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project involves the elimination of an existing single span, steel girder bridge over the Pennsylvania Turnpike including the construction of cul-de-sacs on Hedge Road (T-505). Work items include, but are not limited to: 4,235 CY Excavation, Various Types 3,702 SY Superpave Asphalt Mixture, HMA Courses, Various Mixes 2,029 SY Subbase (No. 2A), Various Depths 829 LF 6” Pavement Base Drain 1,392 LF Temporary Concrete Barrier 3,796 SY Geotextile, Various Types 2,424 SY Mulching – Shredded Bark 1,054 CY Amended Soil 1,313 LF Temporary Protective Fence 2,854 SY Temporary Short-Term, Rolled Erosion Control Product, Type 2D 2,854 SY Permanent Rolled Erosion Control Product, Type 5A 2,675 LF Compost Filter Sock, Various Diameters 701 CY Topsoil Furnished and Placed 1,840 SF Underdeck Protection Shields |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |