Similar Projects
Bit Mill and Overlay, Drainage Repair, ADA Improvements - TH 65
Infrastructure
Conception
$15,000,000 CJ est. value
McGregor, MN 55760

Bit Mill and Overlay, Drainage Repair, ADA Improvements - TH 65
Infrastructure
Conception
$15,000,000 CJ est. value
McGregor, MN 55760

1778 Rd Stations Pavement Seal
Infrastructure
Bidding
$250,000 CJ est. value
Aitkin, MN 56431

1778 Rd Stations Pavement Seal
Infrastructure
Bidding
$250,000 CJ est. value
Aitkin, MN 56431

Hill City School Indoor Air Quality Improvements
Infrastructure
Sub-Bidding
$540,000 CJ est. value
Hill City, MN 55748

Grading
Infrastructure
Post-Bid
$400,000 est. value
McGregor, MN

Quote of Road Work
Infrastructure
Post-Bid
$400,000 est. value
Aitkin, MN

McGrath Area SFR Grading
Infrastructure
Results
$200,000 est. value
McGrath, MN

Salt Storage Shelter, Unheated Storage Shelter and Paving
New Construction, Infrastructure
Results
$300,000 est. value
Aitkin, MN 56431

New Operations Center Project Bid Package No. 2
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Aitkin, MN 56431

36564 208th Place McGregor Septic Install
Infrastructure
Post-Bid
$30,000 CJ est. value
McGregor, MN 55760

Annie Dagle SFR and Hill River Water Crossing
Infrastructure
Results
$1,042,558 CJ est. value
Hill City, MN 55748

20954 363rd Lane, McGregor Onsite Septic System
Infrastructure
Post-Bid
$30,000 CJ est. value
McGregor, MN 55760

Road and Street Bituminous
Infrastructure
Results
$2,265,060 CJ est. value
Aitkin, MN 56431

Bituminous Overlay
Infrastructure
Post-Bid
$3,500,000 CJ est. value
McGregor, MN 55760

Last Updated 01/04/2024 02:53 PM
Project Title

Pliny Township Bridge Replacement Over Snake River

Physical Address View project details and contacts
City, State (County) Lakeside Township, MN 56350   (Aitkin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $552,663 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pliny Township Bridge Replacement over Snake River Expected Award Date:12/12/2023 Project Start Date:12/13/2023 Construction Start Date:12/18/2023 Construction End Date:08/05/2024 The County reserves the right to reject any or all bids and to waive any irregularities thereof. . If you have any questions, contact the MPCA Asbestos Program Coordinator, Colin Boysen at colin.boysen@state.mn.us or 507-206-2644.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents