Similar Projects
Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-50 from the Junction of SR-38 (US-280) in Camp Hill to the Chambers County Line
Results
$1,397,179 to $1,707,663 est. value

Hot-Mix Asphalt Patching
Results
Alexander City, AL

Constructing the Safety Widening, Planing, Resurfacing, Bridge Guardrail Retrofit, and Traffic Stripe on SR-259
Results
$3,510,645 to $4,290,788 est. value
Alexander City, AL

Constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-22 from 0.550 Mile South of Hillabee Creek (MP 122.437)
Results
$3,054,550 to $3,733,339 est. value
AL

MA-ALDOT Scrub Seal Alex City Area
Results

ADA Parking Bays and Walkways to Rear of Apartment 736 A & B Mallory Circle
Post-Bid
Alexander City, AL

MA-ALDOT Strip Patching Alex City Area
Results

Constructing the Widening, Resurfacing Triple Layer Bituminous Treatment , and Traffic Stripe
Infrastructure
Bidding
$848,741 to $1,037,350 est. value
AL

Constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Retofit, and Traffic Stripe on SR-14
Results
$1,163,209 to $1,421,700 est. value
Tallassee, AL 36078

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Planing, Resurfacing, and Traffic Stripe on SR-14
Results
$2,325,445 to $2,842,211 est. value

Southern Region Disaster Recovery Support BPA
Results

MA-ALDOT Alex City area Micro-Surfacing Seal
Results

Alexander City Road Improvement Program, ACRIP FY2020
Results
Alexander City, AL 35010

Pavement Preservation
Post-Bid
AL

Last Updated 06/24/2021 12:00 PM
Project Title

Alexander City Road Improvement Program - ACRIP FY2021

Physical Address View project details and contacts
City, State (County) Alexander City, AL   (Tallapoosa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents