Similar Projects

Term Contract
Design
$2,000,000 to $5,000,000 est. value
Biloxi, MS 39531

Tishomingo County Courthouse Roof-Over
Renovation
Sub-Bidding
$400,000 CJ est. value
Iuka, MS 38852

Revels Hall Roof Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Alcorn, MS 39096

B411 Gutters & Downspouts Installation
Term Contract
Post-Bid
Columbus, MS 39710

Metal Roof Repair and Coating Materials
Alteration
Post-Bid
Meridian, MS

East Central Middle School Gym Roof
Results
$197,920 est. value
Moss Point, MS 39562

New South Marine Building Phase 1, Roof Improvements
Results
$77,500 est. value
Greenville, MS

Long Beach Library Roof Repairs
Renovation
Construction
$142,800 CJ est. value
Long Beach, MS 39560

Forrest General Hospital Emergency Room (ER) Blue Reroof
Renovation
Sub-Bidding
$300,000 CJ est. value
Hattiesburg, MS 39401

Replace Modified Bit Roof East Wing
Alteration
Post-Bid
Jackson, MS 39202

Pemberton HQ`s Porch and Roof Rehab
Renovation
Results
$400,000 to $600,000 est. value
Vicksburg, MS

Replacement of Building 38 Roof in Poplarville
Renovation
Sub-Bidding
$250,000 CJ est. value
Poplarville, MS 39470

Re-Roofing
Alteration
Post-Bid
Leakesville, MS 39451

Franklin Academy - Roof Repairs
Alteration
Results
$360,900 est. value
Columbus, MS

East Mississippi Correctional Facility (EMCF) Roof Repairs Department of Corrections
Renovation
Sub-Bidding
$300,000 CJ est. value
Meridian, MS 39307

Last Updated 02/09/2023 05:11 PM
Project Title

Roofing Program Phase 2 - Upper Elementary

Physical Address View project details and contacts
City, State (County) Laurel, MS 39440   (Jones County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Roofing Program Phase 2 Upper Elementary All proposals must be on file with the Quitman School District prior to the opening time as stated above. All proposals must be sealed and clearly marked on the outside of the envelope as indicated "Roofing Program Phase 2 - Upper Elementary" to be opened on {insert bid date here}. Envelopes not so marked are submitted at the risk of the Bidder and the School District assumes no responsibility for the premature opening of same by any School District employee. The Owner reserves the right to waive any informalities and to reject any or all bids Each bidder must deposit with his bid (or upload at Bidders Option), security in the amount, form and subject to the conditions provided in the Instructions to Bidders. Performance and Payment Bonds will be required from the successful bidder. Bidders shall comply with law of the State of Mississippi requiring Certificate of Responsibility. Resident contractors shall, in accordance with laws of the State of Mississippi, be granted preference over non-residents in the award of this contract in the same manner and to the same extent as provided by the laws of the state of domicile of the non-resident. A non-resident contractor shall attach to his proposal a copy of his resident state's current law pertaining to such state's treatment of non-resident contractors. The successful bidder must adhere to the Owner's policy concerning non-discrimination without regard to race, creed, color, age, sex, national origin or handicap. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Base Bid includes the following: 1. All temporary fences, and general protection system for the students, faculty, and public for this portion of the Work. 2. Protection of existing facades, sidewalks, landscaping, etc. to remain. 3. Temporary waterproofing at all roof penetrations where mechanical or other equipment is removed during progression of the Work, and where building remains open for more than 8 hours. 4. Removal of existing accessories, insulation, edge metal, gutters, downspouts, flashings, curbs, etc., removal/replacement of existing mechanical/electrical equipment and exhaust fans. 5. Furnish and installation of new PVC roofing system, including but not limited to the following (depending on conditions): a. PVC roofing and flashings, cover board, insulation (rigid and some tapered), metal edge, preformed or liquid flashings, metal flashings, gutters, downspouts, and other items shown and required for a complete installation.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents