Similar Projects
Utah Park - Sidewalk and Bridge Abutment Repairs
Renovation, Infrastructure
Bidding
$300,000 to $335,000 est. value
Aurora, CO 80012

Downtown Westminster Block A-4 Woonerf Infrastructure
Infrastructure
Bidding
Westminster, CO

Copperleaf Water Quality Pond J Improvements
Post-Bid
$450,000 to $625,000 est. value
Aurora, CO

High Point PD1 Pond Project
Infrastructure
Post-Bid
Denver, CO

152nd Avenue and Imboden Road Drainage Improvements
Results
CO

South Platte Bank Stabilization
Results
$1,830,000 to $2,200,000 est. value
Aurora, CO

48th Avenue Grading Project
Infrastructure
Post-Bid
Aurora, CO

Reunion Center Stead School Phase District: Reunion Center Metropolitan District No 1
Results
Commerce City, CO 80022

Box Elder Infrastructure Project Phase I
Infrastructure
Post-Bid
Aurora, CO

124th Reservoir Riprap Erosion Protection Construction Project
Results
Brighton, CO

Reunion Pond Maintenance
Infrastructure
Post-Bid
Commerce City, CO

112th and Irma Drive Drainage Improvements
Results
$200,000 to $300,000 est. value
Northglenn, CO 80233

Rec Center Pond Liner
Infrastructure
Post-Bid
Brighton, CO 80602

CM/GC Services for 2021-2024 Rampart 54 PCCP Sliplining Rehabilitation Program
Results
Aurora, CO

Broadway and 62nd Avenue Minor Drainage Improvements
Infrastructure
Results
Brighton, CO

Reported 04/01/2022 12:00 AM
Project Title

Quincy Reservoir Improvements, Package C - Aeration System

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,300,000 to $1,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under the Quincy Reservoir Improvements, Package C: Aeration Project consists of furnishing all labor, materials equipment, tools and supplies including : 1. Demolition of the existing aeration system including piping and valves. 2. Installation of air piping and valves, electrical conduit, communication conduits and spares for new aeration system. 3. Installation of aeration system. 4. Installation of Vertical Profiling System. 5. Installation of electric and instrumentation and controls conduit, wiring, instruments and devices. 6. Installation of radio and connection of water quality measurement devices. 7. Install and maintain Best Management Practices (BMPs) at proposed laydown area and around new concrete pad as shown on the Drawings.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Accessories.
Division 26 - Electrical.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents