Similar Projects
Reported | 04/01/2022 12:00 AM |
Project Title | Quincy Reservoir Improvements, Package C - Aeration System |
Physical Address | View project details and contacts |
City, State (County) | Aurora, CO (Adams County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $1,300,000 to $1,500,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work to be performed under the Quincy Reservoir Improvements, Package C: Aeration Project consists of furnishing all labor, materials equipment, tools and supplies including : 1. Demolition of the existing aeration system including piping and valves. 2. Installation of air piping and valves, electrical conduit, communication conduits and spares for new aeration system. 3. Installation of aeration system. 4. Installation of Vertical Profiling System. 5. Installation of electric and instrumentation and controls conduit, wiring, instruments and devices. 6. Installation of radio and connection of water quality measurement devices. 7. Install and maintain Best Management Practices (BMPs) at proposed laydown area and around new concrete pad as shown on the Drawings. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |