Similar Projects
Construction Management at Risk Services for Kingfish Boat Ramp Improvements
Bidding
Less than $4,500,000 est. value
Holmes Beach, FL 34217

Grampell Drive Bulkhead Improvements
Infrastructure
Bidding
Jacksonville, FL 32221

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Latitude Margaritaville Watersound Amenities, Phase 1 & 2
New Construction - 34,862 SF
Construction
$30,000,000 est. value
WaterSound, FL

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Perdido Key State Park - Building and Structure Repair
Renovation
Bidding
$840,000 est. value
Pensacola, FL 32507

Design-Build Floating Day Dock and Dinghy Dock
Post-Bid
Bradenton Beach, FL 34217

Repairs Berth #5 Mooring Bitt @ MCSF-BIC
Results
$25,000 to $100,000 est. value
Jacksonville, FL 32226

Stephen Foster Folk Culture Center State Park - Canoe Launch Renovation
Infrastructure
Bidding
White Springs, FL 32096

Martin County Bs/Mpz Marker Construction Project
Post-Bid
Jensen Beach, Stuart, FL

White City Boat Ramp Improvements
Results
FL

Marina Mooring Field Inspection, Repair and Maintenance
Term Contract, Infrastructure
Bidding
Titusville, FL 32796

Last Updated 01/21/2022 10:04 AM
Project Title

North Cargo Berth 3 Rehabilitation and Modernization

Physical Address View project details and contacts
City, State (County) Cape Canaveral, FL 32920   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

North Cargo Berth 3, demolish the existing open pile pier and adjacent steel sheet pile wall system. Construct a new approximately 882 foot long deep combi-wall bulkhead berth with a pipe pile supported reinforced concrete relieving platform landside of the new berth wall. Project generally includes, cell fenders, bollards, shoreside and waterside mooring dolphins, earthwork and paving, stormwater conveyance system, potable water and force main wastewater utilities, high mast lighting system, fencing, and approximately 105,500 cubic yards of dredging with offshore disposal.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents