Similar Projects
Construction of Private Water and Private Sanitary Sewer and Public Drainage Facilities to Serve Olympia Falls Section 1
Bidding
TX

Drainage Improvements and Erosion Repair at Brazos Bend State Park
Bidding
$900,000 to $1,300,000 est. value
Needville, TX 77461

Construction of Grand Mission Regional Detention System Maintenance
Post-Bid
$600,000 est. value
TX

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Southern Colony Section 5
Results
Less than $278,500 est. value
TX

Emergency Repair to the Brazos River Outfall
Bidding
TX

Water, Sanitary, and Drainage Facilities in Grand Mission Estates Section 26, Section 27, Lift Station No. 2, and Force Main
Post-Bid
$1,700,000 est. value
TX

Deer Run Meadows Detention Pond
Results
Less than $1,719,602 est. value
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Polo Ranch Section 8
Bidding
TX

Section 17-18 for Jordan Ranch
Post-Bid
Fulshear, TX 77441

Water, Sanitary and Drainage Facilities in Creekside Ranch Section 11
Results
TX

Construction of Water, Sanitary, Drainage and Paving for Walnut Creek at Stonecreek Estates Section 1
Bidding
TX

Water, Sanitary Sewer, Storm Sewer Extensions, and Paving Improvements Serving 42.67 Acre Trac
Post-Bid
TX

Storm Sewer Repair Victoria Garden Drive
Results
Less than $239,744 est. value
TX

Last Updated 07/02/2020 07:54 AM
Project Title

Proposed Detention Basin to Serve Mandola Farms

Physical Address View project details and contacts
City, State (County) Richmond, TX 77469   (Fort Bend County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,670,265
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope includes the detention excavation and storm sewer.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents