Similar Projects
Restoration of Lee Creek Stream at Devils Den State Park
Infrastructure
Bidding
$875,700 est. value
West Fork, AR 72774

Construct a Parking Lot at the Blytheville Elementary School
Infrastructure
Bidding
$300,000 est. value
Blytheville, AR 72315

Corrugated Steel Pipe and Bands
Post-Bid
Hamburg, AR

Drainage Improvements
Infrastructure
Post-Bid
Ward, AR

Hwy. 154 Slide Repair (Conway CO)
Results
AR

Deans Trail Phase 2
Results
$2,300,000 to $2,400,000 est. value
Springdale, AR

Robinwood Drive and Belmont Street Drainage Improvements
Infrastructure
Bidding
$300,000 est. value
Dumas, AR 71639

Reclamation of Brotherton Highwall
Infrastructure
Post-Bid
Branch, AR

Zoo Drainage Improvements Project
Infrastructure
Results
$7,500 est. value
Little Rock, AR 72205

Locust Street and Drainage Improvements
Infrastructure
Bidding
$300,000 est. value
Cabot, AR

Purchase of Precast Reinforced Concrete Box Culverts
Infrastructure
Post-Bid
Rogers, AR

Benton Utilities - Chenault North Reservoir Levee Repair
Infrastructure
Results
Benton, AR

2022 Drainage Improvements Henderson Street
Infrastructure
Bidding
$300,000 est. value
Arkadelphia, AR 71923

Hatcher Lake Road Drainage Project
Infrastructure
Post-Bid
AR

Reclamation of AML Montreal Gob Pile
Infrastructure
Results
Huntington, AR 72940

Reported 06/28/2022 12:00 AM
Project Title

Airport Drainage Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Hot Springs, AR 71913   (Garland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of, but is not limited to, drainage pipe removal and installation, drainage structure installation, and airport perimeter fence removal and installation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents