Similar Projects
Solar Electric - Police Training
Alteration
Conception
$480,000 est. value
Madison, WI 53718

Solar Electric - Police East District
Alteration
Conception
$480,000 est. value
Madison, WI 53716

Upgrade Electrical System Area 2
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Milwaukee, WI

Site Data Communications Redundant Backbone Installation - GPC
Alteration
Bidding
$696,000 est. value
Menomonie, WI 54751

Fence Replacement And Lighting Improvements
Alteration
Bidding
$176,000 est. value
Baraboo, WI 53913

Fire Station 53 Emergency Generator Replacement (Install)
Post-Bid
Elm Grove, WI 53122

J059--Light Poles Removal/Replacement ONE TIME BUY
Post-Bid
Milwaukee, WI

Steam Turbine Generator Improvements
Results
Less than $500,000 est. value
Madison, WI 53704

Price Commons Solar Panel
Results
Menomonie, WI 54751

Electrical Services
Alteration
Bidding
Madison, WI

Wauwatosa City Hall Solar Photovoltaic System
Post-Bid
Wauwatosa, WI 53213

2021 Fiber Projects
Renovation
Results
Madison, WI

Kewaskum School Cooler Expansion
Infrastructure, Alteration
Bidding
Kewaskum, WI 53040

Madison Public Library Lighting - Hawthorne
Post-Bid
Less than $80,000 est. value
Madison, WI 53704

MCC-1A and MCC-1B Improvements
Results
Delavan, WI

Reported 04/16/2022 12:00 AM
Project Title

Replace Generator, Transfer Switch, and Annunciator Panel

Physical Address View project details and contacts
City, State (County) Ashwaubenon, Green Bay, WI 54313   (Brown County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Weather Forecast Office Green Bay (WFO GRB) has a 175 kW emergency power generator that powers the WFO’s operations. This Statement of Work Emergency Power Generator (EPG) is having mechanical problems and is at the end of life and requires replacement. The existing EPG is sized to handle the current electrical demands from this building. The building’s load was analyzed internally by NWS and it was calculated that the building’s electrical demand was 154.02 kVA. This total demand includes a 25% contingency. The site’s utility bills for the last 24 months were reviewed and the max kW demand was only 49,520 kWh and confirming that a single 115-130 kW EPG, with a Diesel engine, can handle the full building electrical load.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents