Similar Projects
Last Updated | 04/03/2019 08:35 PM |
Project Title | Turn Lane Construction and Traffic Signal Upgrade SR 34 at White Oak Dr/International Park |
Physical Address | View project details and contacts |
City, State (County) | Newnan, GA 30263 (Coweta County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Major Items of Work Consist of: 1. Grading Complete: Clearing and Grubbing, Grading 2. Subgrade and Base Preparation to include Graded Aggregate Base 3. Curb and Gutter, Sidewalk, Concrete Median Construction 4. Asphalt Placement: Recycled Asphalt Concrete Superpave, 25MM, 19MM & 12.5mm 5. Drainage: Storm Drain Pipe Installation 6. Temporary and Permanent Erosion Control 7. Temporary Traffic Control 8. Permanent Traffic Control 9. Temporary and Permanent Grassing 10. Traffic Signal Installation Work | ||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |