Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Task Order Unit Price - Curb Ramps and Sidewalks Contract 2
Term Contract, Infrastructure
Post-Bid
Less than $4,000,000 est. value
Seattle, WA

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

Reported 06/22/2022 12:00 AM
Project Title

Timberlane Way SRTS

Physical Address View project details and contacts
City, State (County) Covington, WA 98042   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $450,000 to $500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist of furnishing all labor, tools, materials, and equipment necessary for construction ofthe Timberlane Way SRTS project. Specific work includes, but is not limited to installation of roadway restoration, roadway grading, storm drainage, driveway construction, King County Metro transit stops curb and gutter, pedestrian faciliities, ADA curb ramps, channelization, signing, and other work as other work as accordance with the Contract

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents