Similar Projects
Upgrade Force Protection and Emergency Power, Test Sites
Design
$500,000 to $1,000,000 est. value
Munnsville, Newport, NY 13416

Hudson Valley, Castle Point Chiller Plant Monitoring, Operation & Preventative Maintenance
Term Contract
Design
Wappingers Falls, NY 12590

Installation of a New Fresh Air System
Renovation
Sub-Bidding
$300,000 CJ est. value
Jamestown, NY 14701

Replace AHU-1 and Upgrade Team Meeting Room HVAC
Renovation
Sub-Bidding
$965,000 CJ est. value
Buffalo, NY 14202

WPCP Rooftop HVAC Replacement-REBID
Renovation
Post-Bid
$80,000 CJ est. value
Poughkeepsie, NY 12601

SMD Services the Repair, Alteration and Installation of Range Hood Fire Suppression Systems Located at Various Developments Within the Five (5) Boroughs of New York City
Term Contract, Alteration
Post-Bid
Brooklyn, NY

Leonard Branch Library HVAC and Roof Replacement
Alteration
Results
Brooklyn, NY 11211

Albany 8 Server Room HVAC Replacement
Alteration
Results
Albany, NY 12205

HVAC Work Replace Switchgear Swan Street Building Empire State Plaza
Renovation
Post-Bid
$500,000 CJ est. value
Albany, NY 12242

Cumberland Cooling Tower Replacement
Alteration
Results
$800,000 to $900,000 est. value
Brooklyn, NY 11205

Provide Forensic Identification Unit and Additions - HVAC Work
Addition, Demolition, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Batavia, NY 14020

Highway Garage Heating System Replacement
Alteration
Results
Rhinebeck, NY 12572

Kitchen Exhaust Hoods and Exhaust Fan Cleaning and Inspection
Alteration
Post-Bid
Buffalo, NY

2020 Capital Improvement Project Contract 103: Mechanical Work (HVAC)
Alteration
Results
$1,179,000 est. value
Alexander, NY

2022-23 Facilities and Operations - Air Filters
Term Contract
Post-Bid
Hopewell Junction, NY

Last Updated 10/17/2023 10:16 AM
Project Title

Smiley Art Building - Penthouse HVAC Renovation

Physical Address View project details and contacts
City, State (County) New Paltz, NY 12561   (Ulster County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. The scope of work for this project consists of adding central air conditioning for the Graduate Studios located on the 3rd Floor of the Smiley Art Building. The main features of the "Base Bid" work shall include, but are not limited to the following 1. Major removal work by Contractor includes: A. Complete removal of existing supply and return grilles in graduate studios 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 311, 313, and 315. B. Prior to bidding, verification of all existing materials needing to be removed, and in coordination with all the work shown on the drawings and listed in the specifications. 2. Major new work by Contractor includes providing and installing all new materials as per the drawing plans and details and as described below: A. Providing and installing a fully functional hvac system consisting of, but not limited to all new roof mounted ductless split system heat pumps, dunnage, wall mounted condensate pumps, sleeves, escutcheons, wall mounted cassette units, condensate drains, refrigerant piping and refrigerant, grilles and diffusers, thermostats, and control wiring as coordinated with removal work, in quantities as shown on the drawings, and as noted in the specifications. B. Providing and installing all new sub-power panels, conduit, wiring, supports, disconnects, and circuit breakers from existing power panels to new sub-panels as shown on the drawings and as noted in the specifications. **As of January 16,2023, We are not moving forward with this project.No definite date for the rebid.** Smiley Art Building - Penthouse HVAC Renovation Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The State University of New York reserves the right to reject any or all bids. CR No - 2102675

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents