Similar Projects
US 176 Widening Phase I
Bidding
SC

Block-Cement and Asphalt Repair
Term Contract
Post-Bid
Charleston, SC 29402

Kiawah Island Parkway Improvement Project
Post-Bid
Kiawah Island, SC 29455

Wappoo Road at SC Highway 61 Intersection Improvements TST
Results
Charleston, SC

West 9th Street Roadway Improvements CTC
Results
North Charleston, SC

North Charleston 2019 Resurfacing Project
Results
Less than $1,717,313 est. value
North Charleston, SC

Rehabilitation - Charleston County
Results
SC

Fall 2019 Resurfacing
Results
Summerville, SC

Preservation - US 521 Clarendon CO
Results
SC

Preservation - District 6
Results

Rehabilitation - Charleston County
Results
SC

Rehabilitation/Reconstruction - District 6
Results

Preservation - District 6
Results

District 6 Interstate Patching
Results

2019 Resurfacing Plan
Results
Mount Pleasant, SC 29464

Last Updated 09/11/2020 11:28 AM
Project Title

Reconstruction/Rehabilitation - District 6

Physical Address View project details and contacts
City, State (County) (Berkeley, Charleston Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 4.000 Ea Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 353.551 Sy Unclassified Excavation 100.000 Cy Borrow Excavation 2,875.000 Cy Additional Rock For Full Depth Reclamation 559.000 Ton Cement Modified Recycled Base (10" Unif)-Curing Method b 36,564.000 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 27,600.000 Sy Portland Cement For Cement Modified Recycled Base Course 2,233.000 Ton Maintenance Stone 58.880 Ton Liquid Asphalt Binder Pg64-22 971.985 Ton Full Depth Asph. Pav. Patching 8" Unif 5,888.000 Sy Milling Existing Asphalt Pavement 1.75" 62,751.000 Sy Milling Existing Asphalt Pavement 2.0" 8,760.000 Sy Milling Existing Asphalt Pavement (Variable) 4,120.000 Sy Milled-In Rumble Strip 5.000 Mi Hot Mix Asphalt Surface Course Type b 16,780.634 Ton Driveway Paving-Surface Type c 1,376.875 Ton Permanent Construction Signs (Ground Mounted) 1,824.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 3,702.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 68,878.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 950.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 50.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 627.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 16.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 12.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 2.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Perm.Pvmt.Marking 2.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 4,220.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 58,883.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 7,430.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 165,209.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 1,900.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 1,284.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 32.000 Ea White Word Message "Only"-Fast Dry Paint 24.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 4.000 Ea White Lane Drop Arrow (Left Or Right)-Fast Dry Paint 4.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 11,420.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 127,814.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 890.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Fast Dry Paint 100.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 226.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 825.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 350.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 5,250.000 Lf Sawcut For Loop Detector 2,472.000 Lf Adjust Drop Inlet Adjust d. i. 4.000 Ea Concrete Sidewalk(4" Uniform) 256.440 Sy Concrete Sidewalk(6" Uniform) 26.667 Sy Detectable Warning Material 135.000 Sf Concrete Median 6.700 Sy Pedestrian Ramp Construction 50.000 Sy Rip-Rap (Class b) 2.000 Ton Geotextile Fabric For Erosion Control Under Riprap (Class 2) 20.000 Sy Permanent Grassing For Non-Permitted Resurfacing Projects 6.419 Acre Silt Fence 700.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents