Last Updated 08/27/2021 09:46 AM
Project Title

Multipurpose Structure Rehab - Cedar Creek Watershed

Physical Address View project details and contacts
City, State (County) Elmo, TX   (Kaufman County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements and repair of the existing earthen embankment and structural spillways. Major Project work includes the raising of the dam crest by 5 to 6 feet, the filling and flattening of the downstream slope with general fill and lime-treated fill to a 3H:1V slope ratio, the replacement of the upstream stone riprap, the construction of a new principal spillway tower, conduit and impact basin, the replacement of the existing structural spillway, widening and improvements to the auxiliary spillway, construction of a new raw water pipeline, and the installation of internal drainage piping along the dam toe and structures. The work will require approximately: 56,000 cubic yards of common excavation; 105,000 cubic yards of earthfill; 57,000 cubic yards of lime treated earthfill; 194,000 square yards of topsoil, 221 feet of 60-inch principal spillway conduit, 3,110 cubic yards of concrete; 429,000 pounds of reinforcing steel; 28,000 tons of rock riprap; 2,660 cubic yards of drainfill; 1,510 square yards of block-face, MSE retaining wall; 2,600 cubic yards of gravel road base; 800 linear feet of chain-link fence; 16,000 linear feet of barbed-wire fence; and 96 acres of vegetation. Soil disturbing activities will include: constructing the access; excavating and placing earth fill on the embankment crest, downstream slope, wave berm and upstream (back) slope; placing rock riprap on the wave berm; stripping and excavating of borrow areas; disposing of waste materials; and grading, shaping, and replacing topsoil. Construction will require care-of-water and the installation and removal of a cofferdam system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents