Similar Projects
WNCC Alliance Powerline HVAC Rebid
Renovation
Sub-Bidding
$449,000 CJ est. value
Alliance, NE 69301

City/County Luxford Studio Fan Coil Replacement
Renovation
Sub-Bidding
$90,000 CJ est. value
Lincoln, NE 68508

McMillan MS Closed Circuit Cooling Tower Addition
Infrastructure
Post-Bid
$900,000 est. value
Omaha, NE 68112

Knickrehm Elementary School HVAC Renovations Project
Alteration
Post-Bid
$400,000 est. value
Grand Island, NE 68801

West Cooling Tower Replacement
Alteration
Results
Louisville, NE

Rohwer Elementary School Heat Pump Replacement
Alteration
Results
Omaha, NE

ESU 13 H.V.A.C. Upgrade Phase II
Renovation
Construction
$191,647 CJ est. value
Scottsbluff, NE 69361

Kiewit Lodge HVAC Replacement
Renovation
Sub-Bidding
$590,000 CJ est. value
Ashland, NE 68003

Installation of Master HVAC Controls
Alteration
Post-Bid
$70,000 est. value
Lexington, NE

KPS Central Elementary School DOAS
Alteration
Results
Kearney, NE 68845

Western Nebraska Veterans Home Assisted Living Unit Chiller Replacement
Renovation
Sub-Bidding
$175,000 CJ est. value
Scottsbluff, NE 69361

Elliott Building Second Floor HVAC Replacement
Alteration
Post-Bid
$2,900,000 est. value
Scottsbluff, NE 69361

Stolley Park Wading Pool Demolition
Demolition, Infrastructure
Results
$41,312 CJ est. value
Grand Island, NE 68801

2022 HVAC Service Contract
Alteration
Post-Bid
Lincoln, NE

Phelps Wing HVAC Project
Alteration
Results
Grand Island, NE

Last Updated 09/19/2023 03:12 PM
Project Title

Air Heater Baskets Replacement

Physical Address View project details and contacts
City, State (County) Hastings, NE 68901   (Adams County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $785,517 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 6, 2023, an award has not yet been made. Per the owner, bid results will not be made available until after the award is announced. No time-frame is available for when this project will be awarded. Air Heater Baskets Replacement at Whelan Energy Center, Unit 2, Public Power Generation Agency, Hastings, Nebraska Proposals received after the above time and date will be returned unopened to the party submitting the proposal, Each proposal snail be accompanied by a cashier's check, certified check on a solvent U.S. commercial bank, or a bid bond in an amount of not less than five percent (5%) of thetotai bid. Such check or bid bond shall be contained in a separate envelope attached to bidder's proposal. Ail proposal and bid bonds shall have original signatures The successful bidder wiii be required to furnish a Performance Bond in the sum of the full amount of the Contract within ten (10) davs of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. Proposals will be considered only from those bidders who are qualified by previous experience in performina work of this type scope and complexity specified. Bidders without previous successful work history with ppqa wj|| pe required to pre-qualifv bv submitting in- formation concerning their organization experience "and financia| status as requested in the bidding instructions The PPGA reserves the right to accept the bid which - best suits its needs whether the price is the lowest or not reject or all bids and o waive any informalities No proposal may be altered withdrawn or resubmitted within 60 days after the date set for the opening of proposals

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents