Similar Projects
Tyngsborough Middle School
Addition
Design
$81,000,000 est. value
Tyngsborough, MA 01879

HVAC and Mechanical Products
Term Contract
Post-Bid

J045--VISN 1 - Pipe-Steam Fitting 5-Year Pop Agreement
Post-Bid
Newington, West Hartford, West Haven, CT - Bedford, Boston, Brockton, Northampton, MA - Augusta, ME 06516

Lowell High School - Filed Sub Bids
Renovation, Addition
Results
$270,000,000 est. value
Lowell, MA

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

Design and Construction of Diffused Aeration/De-Stratification System for Town Reservoir
Post-Bid
Wakefield, MA

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

J041--Repair RTU Unit Bldg 78
Post-Bid
Bedford, MA 01730

Construction Management at Risk Services - Stoneham High School
Results
Less than $140,000,000 est. value
Stoneham, MA 02180

Capen Court Air-Cooled Chiller Compressor Replacement
Post-Bid
$16,500 est. value
Somerville, MA 02144

SPBN 082023 Repair HVAC B104
Results
Less than $410,000 est. value
Hanscom A F B, MA

North High School Chiller and Related Equipment Service
Post-Bid
$125,000 est. value
Newton, MA

SPBN 162006 Repair HVAC B162
Results
Less than $440,000 est. value
Hanscom A F B, MA

Belmont Middle-High School Renovation/Addition
Renovation, Addition
Post-Bid
$400,000 est. value
Belmont, MA

Gleason Library Chiller
Results
$80,000 est. value
Carlisle, MA 01741

Last Updated 07/25/2022 03:05 PM
Project Title

Installation of New Unit Ventilator Controls in Existing and Occupied Classrooms at the Mccall Middle School

Physical Address View project details and contacts
City, State (County) Winchester, MA 01890   (Middlesex County)
Category(s) Education, Single Trades
Sub-Category(s) HVAC, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new unit ventilator controls in existing and occupied classrooms at the McCall Middle School. Scope includes fully converting controls and integrating into existing METASYS System.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents