Similar Projects
Southeast Creekview Drive Wetland - STM-22-001 - City of Ankeny
Infrastructure
Conception
$1,300,000 CJ est. value
Ankeny, IA 50021

Rehabilitation of One (1) Home
Term Contract, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Greene, IA 50636

Grading
Infrastructure
Sub-Bidding
$15,000,000 CJ est. value
Altoona, IA 50009

Lead Hazard Reduction 540 Almond
Alteration
Post-Bid
Less than $25,000 est. value
Dubuque, IA 52001

Lead Hazard Control 727 Alta Vista and 1972 Rockdale Road
Alteration
Post-Bid
$25,000 est. value
Dubuque, IA 52001

Lead Hazard Control 2841 Elm Street and 129 East 27th Street
Alteration
Results
$25,000 est. value
Dubuque, IA 52001

Asbestos Abatement at 133 1st Street South East
Alteration
Results
Hopkinton, IA 52237

Winterset New Environmental Center And Headquarters
New Construction, Infrastructure - 12,400 SF
Pending Verification
$3,250,000 CJ est. value
Winterset, IA 50273

Fog Seal
Infrastructure
Sub-Bidding
$40,000 CJ est. value
Altoona, IA 50009

Lead Based Paint Remediation
Alteration
Post-Bid
$5,000 to $20,000 est. value
Marshalltown, IA 50158

Industrial Technology Center Modernization - Asbestos Abatement
Alteration
Results
Cedar Rapids, IA

Webster City Municipal Airport Taxiway Lighting; MEC
Infrastructure
Sub-Bidding
$277,000 CJ est. value
Webster City, IA 50595

Lead Hazard Control
Alteration
Post-Bid
$50,000 est. value
Dubuque, IA 52001

Lead Hazard Control 576 Central, 1972 Rockdale, 1914-1916 Grace
Alteration
Results
$25,000 est. value
Dubuque, IA 52001

Emerald Ash Borer Mitigation - Removal of Ash Trees
Infrastructure
Sub-Bidding
$74,000 CJ est. value
Algona, IA 50511

Last Updated 03/09/2023 03:34 PM
Project Title

Guardrail Repair/Replacements - Multiple Locations

Physical Address View project details and contacts
City, State (County) Davenport, IA 52801   (Scott County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Davenport is issuing a request for quotes for repair/replacements of City guardrails. The City of Davenport reserves the right to award to multiple vendors. Location 1 W 3 rd Street, between Telegraph Road and Waverly Road, on the north side of the street. Repair all damaged posts, blocks, w-beams, & flared end sections as needed. Location 10 Wapello Avenue, near the intersection of Rockingham Road. Replace all damaged posts, blocks, and end sections as needed. Vegetation removal will be completed by others prior to guardrail repair. Location 11 Warren Street, south of W 5thStreet, at culvert outlet. Replace sign, sign post and guardrail. Location 2 E 53rd Street, between Carey Ave and the railroad tracks, on the south side of the street. Repair/replace end terminal. Location 3 E 53rdStreet at bridge over Goose Creek, between Grand Ave and Tremont Ave, on the south side of the street. Repair/replace w-beams and adjust or replace post and blocks as needed. Location 4 River Street, between River Drive and Glenwood Avenue adjacent to Lindsey Park, on the south side of the street. Repair damaged stone columns and repair or replace cable. Location 5 N Lincoln Avenue, between W 4th street and Telegraph Road, on the west side of the street. Repair or replace damaged w-beam as needed, adjust or replace block. If w-beam is replaced, install reflectors on new beam which are similar to existing reflectors. Location 6 Rockingham Road, near the intersection of S Elsie Avenue, on the south side of the street. Repair or replace damaged barrier wall. Location 7 Rockingham Road over Walnut Creek, near John Fell Drive, on the southeast side of the street. Repair or replace end terminal. Location 8 S Elmwood Avenue, north of Boies Avenue, on the west side of the street. Repair or replace all damaged posts, blocks, w-beams and flared ends as needed. Vegetation removal will be completed by others prior to guardrail repair.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents