Last Updated | 01/24/2023 12:07 AM |
Project Title | Renovate SCI Therapy Gym - Construction |
Physical Address | View project details and contacts |
City, State (County) | San Antonio, TX 78229 (Bexar County) |
Category(s) | Entertainment/Recreation, Government/Public, Medical |
Sub-Category(s) | Fitness Center, Hospital, Military Facility |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information. Acquisition Title: Constr. - Renovate SCI Therapy Gym, located on the Ground Floor, Audie L. Murphy South Texas Health Care System, 7400 Merton Minter San Antonio, Texas 78229. Contractor shall furnish all necessary labor, materials, equipment and transportation necessary to complete the project of renovating and modernization of the therapy gym to comply with the VA's design manuals and design guides. MAGNITUDE of the Construction Project: Between $100,000 and $250,000. The applicable North American Industry Classification System (NAICS) code for this project is 236220. This is a "competitive" requirement Set Aside 100% Service Disabled Veteran Owned Business (SDVOSB) only. All offerors must be certified in CVE at time quotes are submitted. Site Visit will be held on 17 August, 2022 @ 10:00 AM CST. All interested Contractors shall meet at the Audie L. Murphy VAMC, 7400 Merton Minter, San Antonio, TX, 78229 ; Meet in E009 Conference Room. Cut off for submission of RFI(s) is August 25, 2022 @ 10:00AM CT. All RFI(s)/questions must be submitted in Word Format and emailed to the following e-mail address: barbara.dustin@va.gov. Please include the Solicitation No. 36C25722Q0916 on the subject line. SUBMISSION OF BIDS: All Offerors shall be submitted via e-mail to the following email address: by the date and time as stated in Block 13 below. All offerors must submit a Bid Guarantee as part of their Bid Package. required level of Performance and Payment Bonds. Barbara.dustin@va.gov Additionally, awardee must be able to obtain the Funds are not currently available for this solicitation. Award of a contract as a result of this solicitation is contingent upon the availability of appropriated funds from which payment of this contract may be made. There shall be no legal liability on the part of the Government for contract purposes until funds are made available to the Contracting Officer. The Contracting Officer will confirm availability of funds prior to award of a contract. The Government will award to the lowest price determined to be reasonable. PURPOSE: The Department of Veterans Affairs (VA) intends to renovate the SCI Therapy Gym located on the ground floor at the Audie L. Murphy division of the South Texas Veterans Health Care System. The project is located at 7400 Merton Minter San Antonio, TX 78229. The project is intended to renovate and modernize the therapy gym to comply with the VA's design manuals and design guides. 2. SCOPE OF WORK 2.1 General: Provide all labor, materials, supplies, tools and equipment, supervision and construction services necessary for the Renovate SCI Therapy Gym project. All necessary testing and commissioning are required. Work shall include: Base Bid - The contractor shall furnish all labor, materials, equipment, supervision and all other necessary provisions to renovate the existing SCI Therapy Gym at the Audie Murphy VA Medical Center in accordance with the Contract Documents. Work shall include all demolition and new work in accordance with the Contract Documents. Work to be performed includes but is not limited to: o demolition and replacement of floors and wall bases o Removal and storage of existing equipment o Preparation for and application of new paint for walls, door frames, window frames, etc. o Demolition of existing flooring, preparation, and construction of new sloped entrance at door C002B o Addition of new automatic door openers and sensors o demolition and replacement of electrical outlets and addition of new outlets It is recommended that bidders attend the pre-bid site visit to become fully acquainted with existing site conditions and the scope of work. All numbers are approximate. Contractor need to verify all amounts. If there is a discrepancy in the amounts provided and or any condition affecting work shall be brought to the attention of the VA Representative before proceeding with the work. The Contractor shall be responsible for obtaining and coordinating the services of any and all third-party Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely delivery, and documented final product. O&M Manuals, As-Built drawings in CAD and PDF, applicable permits, installation, testing, and commissioning are also required. Normal hours of operation for the project are 8:00AM to 4:30 PM Monday through Friday except for Federal Holidays. The Contractor will be required to work on Saturday, Sunday, holidays, or outside the project site's normal working hours for items impacting patient care (i.e. power outages and/or demo placing patients in harm's way, crane). The contractor will need to submit a written request for approval to the VA-COR at least three (3) working days prior to the proposed start of such work. 2.2 DESCRIPTION OF WORK A. Existing Conditions a) Before disabling any of the following systems, the contractor needs to coordinate with COR at least 3 working days in advance. Contractor shall be responsible for relocating and temporary installing all utilities and controls, including, but not limited to, telephone, data, electrical, med/gas, emergency power, AV alarms, smoke detectors, sprinklers heads, speakers, nurse call, card readers, isolation monitor, phone booster, wifi boosters, pull stations, etc. It is the contractor's responsibility to immediately repair any tampered with system at no additional cost to the government. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |