Similar Projects
Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Ben Lomond Golf Course Mixed Use
New Construction - 40,836 SF
Design
Harrisville, UT 84414

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Post-Bid
$40,000,000 CJ est. value
Salt Lake City, UT 84101

Antelope Island State Park, White Rock Bay Campground
Infrastructure
Results
$2,245,755 CJ est. value
Syracuse, UT 84075

Redevelopment Site 738 - 756 30th Street
Infrastructure
Results
Ogden, UT 84403

Turner Mill Mixed Use
New Construction - 125,000 SF
Construction
$10,000,000 CJ est. value
Heber City, UT 84032

Black Desert Resort
New Construction
Construction
Ivins, UT

Alta Townhomes & Commercial Development
New Construction, Infrastructure - 9,481 SF
Pending Verification
$17,000,000 CJ est. value
Clearfield, UT 84015

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Chrome Works
New Construction, Infrastructure
Design
$88,000,000 CJ est. value
Salt Lake City, UT 84101

Harvest View Park Phase 2 - Site Construction
Renovation
Post-Bid
Santaquin, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

Last Updated 02/21/2023 11:23 AM
Project Title

Mountain Green Sewer Improvement District 2023 BNR Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Mountain Green, UT 84050   (Morgan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Civil Engineer - 08/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Draining of existing cell #2. Construction of 6,500 SF Operations Building (Smooth Face CMU). Construction of 5,000 SF Headworks Building (Smooth Face CMU). Installation of Biological Nutrient Removal Basin Equipment. Construction of (2) Clarifiers. Construction of a Large Digester Split Into (2) Sides. Electrical, Mechanical HVAC, and Plumbing. Chemical feed system: Two dual pump skid (4 pumps total), 1/2" tubing, 1/2" sch 80 PVC, 3" conduit, Pressure Gauges, Construction of Yard Piping including 6"-24" HDPE and Ductile Iron Lines, Sewer, Chemical Lines, Backwash Piping, Sludge Piping, Return Waste Water Lines, and Electrical System Upgrades including on-site back-up generator. Site Construction including import structural fill, asphalt paving, landscaping, and curb and gutter. Installation of Mechanical Dewatering System (Screw Press) Owner anticipates that the Project's total bid price will be approximately $19,000,000. The Project has an expected duration of 730 days. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. All questions must be submitted by February 14 th, 2023, at 5:00 PM. Contact information and submittal procedures for such questions are as follows: A. Ian Hammond, ihammond@sunrise-eng.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents