Similar Projects
Reported | 12/29/2018 12:00 AM |
Project Title | Generator Repair |
Physical Address | View project details and contacts |
City, State (County) | Detroit, MI (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove/Dispose of Existing, 1.5" and 2" black steel FOS/FOR lines on concrete, from main tanks to generator enclosures 2. Furnish and install new 1.5"/2" stainless steel ProPress FOS/FOR lines, connect to existing piping coming out of generator enclosures at existing ball valves, and at Vertical lines from tanks at ball valve approximately 5' from ground surface. Estimated to be about 100' of both lines 3. Anchor piping to existing concrete on Unistrut (Approx. 80' of each line) 4. Furnish and install new heat tracing and insulation on new piping and connect 5. Reuse existing straddle steps over the new pipes 6. Provision of warranty period/options for piping and piping installation services | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |