Similar Projects
Various Sewer Man Hole, Drain Man Hole, Catch Basin Repairs
Infrastructure
Bidding
$45,000 est. value
Saugus, MA

Catch Basin and Manhole
Term Contract
Bidding
Beverly, MA

Lowlands Sewer Manhole Repairs
Post-Bid
Less than $24,000 est. value
Nahant, MA

On-Call Maintenance and Operation Service at Sewer Facilities
Post-Bid
Peabody, MA

Spicket River Interceptor Rehabilitation
Results
Less than $350,000 est. value
North Andover, MA

Sewer Cleaning/Pumping Services
Results
Less than $30,000 est. value
Gloucester, MA

Installation of Approximately 3,000 Linear Feet of Cured-In-Place Pipe
Infrastructure
Bidding
$2,570,000 est. value
Lawrence, MA

Danvers Siphon Rehabilitation
Post-Bid
Salem, MA

Fowler Street and Railroad Avenue Sewer Repairs and Improvements
Results
Less than $85,000 est. value
Salisbury, MA 01952

Wastewater Collection System Cleaning and CCTV Inspection
Infrastructure
Bidding
$177,000 est. value
Danvers, MA

Peabody Infiltration/Inflow Reduction Project, Phase II
Results
Peabody, MA

Replacement of the Existing Septic Systems
Results
Less than $75,000 est. value
Manchester-By-The-Se, MA 01944

Stacy's Brook Sewer System Rehabilitation Project Phase 1C
Results
Less than $1,800,000 est. value
Swampscott, MA

Purchase of Polyvinyl Chloride Pipe
Term Contract
Results
Beverly, MA

On-Call Pipe Lining and Manhole Rehabilitation
Results
Less than $600,000 est. value
Gloucester, MA 01930

Last Updated 02/16/2022 09:48 AM
Project Title

Phase 3 West Lynn Sewer Separation Project

Physical Address View project details and contacts
City, State (County) Lynn, MA   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $34,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is generally located in at Neptune Park along Commercial Street near the intersection of Bennet Street, bounded by the MBTA rail line to the south, Commercial Street to the west, an apartment complex to the north and public park to the east. The force main portion of the project is in Commercial Street from the intersection of Commercial and Bennet Streets at the beginning and ends to the south approximately 1,000 feet on Commercial Street to approximately 280 feet south the intersection with the Lynnway.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents