Similar Projects
2021 CDBG Wastewater Improvements
Renovation
Design
$6,000,000 CJ est. value
Morton, MS 39117

RFP Homeowner Rehabilitation/Reconstruction
Infrastructure
Bidding
Forest, MS 39074

Channel Improvement, Baleshed Landing Dikes 2,3, and 4, Dike Construction
Infrastructure
Bidding
$5,000,000 CJ est. value
Forest, MS 39074

Construction of the 2022 Roadway Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Morton, MS 39117

Raytheon Water Well
Infrastructure
Post-Bid
$300,000 CJ est. value
Forest, MS 39074

2022 Roadway Improvements
Infrastructure
Results
$1,709,212 CJ est. value
Morton, MS 39117

2021 CDBG Wastewater Improvements Project
Renovation
Results
$823,500 CJ est. value
Morton, MS 39117

Amazon Pearl River Solar Farm / Scott County
New Construction, Infrastructure
Construction
$235,000,000 CJ est. value
Morton, MS 39117

Jim and Thomas Duff Center
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Forest, MS 39074

Box Bridge and Approaches on Denson Road
Infrastructure
Post-Bid
$500,000 CJ est. value
Morton, MS 39117

Construction of a New Maintenance Building for Thomasville Water Association
New Construction, Infrastructure
Results
$299,000 CJ est. value
Forest, MS 39074

Gaddis Park Mini-pitch
Infrastructure
Bidding
$500,000 CJ est. value
Forest, MS 39074

Replacement of Deficient Bridges With New Structures on Pea Ridge Road
Demolition, New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Forest, MS 39074

Front Street Bank Stabilization
Infrastructure
Results
$211,000 CJ est. value
Forest, MS 39074

Breakroom Office Building
New Construction, Infrastructure - 10,296 SF
Post-Bid
$2,200,000 CJ est. value
Forest, MS 39074

Last Updated 06/23/2023 04:03 PM
Project Title

Wastewater Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Forest, MS 39074   (Scott County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT HIGHLIGHTS: This Project funded with EGLE State Revolving Fund (SRF) ARPA funding. Bidders are required to complete the Certification Regarding Debarment, Suspension and other Responsibility Matters statement included in Project Manual. PROJECT DESCRIPTION: Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Demolition of three (3) existing centrifugal blowers, installation of three (3) new centrifugal blowers, dissolved oxygen meters and controls, selective demolition of existing air piping and valves, construction of new air piping and associated valves. Selective demolition of existing elevated concrete walkways, railings and stairs and installation of new elevated metal walkways, railings and stairs. Installation of new ultrasonic level controller and associated electrical work for existing headworks fine screen. SCADA programming for proper operation, control and monitoring of new equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents