Similar Projects
Purchase Three - Phase Power Transformer With Load Tap Changer
Alteration
Bidding
Anaheim, CA

Replacement of Emergency Generator and Automatic Transfer Switch for Water Division Headquarters
Alteration
Bidding
$180,000 est. value
Orange, CA 92866

Overhead Electric System Improvement - City of Anaheim
Alteration
Post-Bid
Anaheim, CA 92805

Plant 2 Distribution Center H 480V Switchgear Under-Voltage Relays Upgrade
Alteration
Post-Bid
Fountain Valley, CA

FMS Paving and Lighting
Infrastructure, Alteration
Results
$1,500,000 est. value
Los Alamitos, CA 90720

Fullerton College Swing Space
Renovation, Alteration
Results
$420,000 est. value
Fullerton, CA 92832

Electrical, Fire Protection, and Low Voltage Systems Services
Alteration
Bidding
San Juan Capistrano, CA

Generator Maintenance and Repairs
Term Contract
Post-Bid
Sacramento, Vina, CA 95811

Senior Center Generator
Term Contract
Results
$170,000 est. value
Brea, CA 92821

Civic Center Secured Lot Electrical Upgrades
Alteration
Bidding
$200,000 est. value
Irvine, CA 92606

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

WRP Sluice Gate Replacement Project
Infrastructure
Results
$70,000 est. value
San Clemente, CA 92673

15 KV, Three Phase, Vault Mounted Gas Switchgear (Spec E-148)
Alteration
Bidding
Anaheim, CA

Secondary Treatment VFD Replacements at Plant No. 2
Infrastructure, Alteration
Post-Bid
$1,632,000 est. value
Fountain Valley, Huntington Beach, CA 92646

Luminaires, Cross Arms, Fuses, and Electrical Materials
Alteration
Results
Anaheim, CA 92805

Last Updated 06/15/2022 11:56 PM
Project Title

City Council Chamber Lighting Upgrade

Physical Address View project details and contacts
City, State (County) Laguna Beach, CA 92651   (Orange County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $112,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work comprises of the removal of existing and installation of new lighting fixtures and equipment, including upgrades to the existing electrical systems, circuits, outlets, conduits, wires, and all other components required to complete the work in place, as shown and described on the Plans and these Specifications, all within the City of Laguna Beach. The City Council Chambers shall remain open for evening meetings throughout the construction. As such, Contractor shall be responsible for leaving the room clean, free of all debris, dust, construction materials, tools, etc.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents