Similar Projects
Last Updated | 10/09/2023 11:03 AM |
Project Title | Sidewalk Connection Project |
Physical Address | View project details and contacts |
City, State (County) | Milton, GA 30004 (Fulton County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $542,154 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of october 09,2023, project was awarded to Blount Construction Company Inc, awarded amount is $542,153.74.** Reference Number 0000323014 The City of Milton is requesting bids from interested parties to perform construction services completing concrete sidewalk installation and asphalt paving . To bid on this contract, the Contractor must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list. No exceptions. All qualified bids will receive consideration without regard to age, handicap, religion, creed or belief, political affiliation, race, color, sex, or national origin. The City of Milton reserves the right to reject any or all bid/proposals and to waive technicalities and informalities, and to make award in the best interest of the City of Milton. Question Acceptance Deadline 06/23/2023 05:00 PM EDT PROJECT SPECIFICATIONS 1. To bid on this contract, the Contractor must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list. No exceptions. 2. The Contractor shall comply with the details and specifications for this project. In addition to other standard specifications referenced herein, the bid package includes: a. Special Provision 163 - Miscellaneous Erosion Control Items; b. Special Provision 165 - Maintenance of Temporary Erosion and Sedimentation Control Devices; c. Special Provision 171 - Silt Fence; d. Special Provision 700 - Grassing. 3. Where contract documents reference "the Department" or "GA Department of Transportation" or "the Engineer", it shall also mean "City of Milton." 4. All traffic control measures, and signage are the responsibility of the Contractor. Contractor shall coordinate all work with the City of Milton. 5. Replace, in kind, any vegetation or landscaping damaged during construction. Include cost in the price bid. Final stabilization will be sod and pine straw as called out in the bid documents. 6. Unless otherwise directed, all work performed under this contract shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition), and Special Provisions modifying them, except as noted herein |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |