Similar Projects
Pure Green Juice - Buckhead Crossing / Atlanta
Renovation - 1,249 SF
Post-Bid
$210,000 CJ est. value
Atlanta, GA 30324

Palmetto Bradley Drive Culvert Replacement
Infrastructure
Post-Bid
$600,000 CJ est. value
Palmetto, GA 30268

Exhibit Halls A and B Concrete Repair
Term Contract
Results
$400,000 est. value
Atlanta, GA 30313

2021 LMIG Street Resurfacing, Group 1 - North
Infrastructure
Results
$5,281,851 CJ est. value
Atlanta, GA 30334

On Call - Concrete Installation, Maintenance
Term Contract
Post-Bid
Johns Creek, GA 30022

Campus Recreation Center (CRC) Competition and Dive Pool Filter Systems Replacement
Renovation
Results
$2,254,890 CJ est. value
Atlanta, GA 30318

RFP D/B - Grant Park Rooftop Restaurant Lease
New Construction, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Atlanta, GA 30308

FY23 Sidewalk Repair and Replacement
Infrastructure
Results
$338,750 CJ est. value
Alpharetta, GA 30009

Pavement Preservation Asphalt Rejuventation
Infrastructure
Post-Bid
$300,000 CJ est. value
Milton, GA 30004

Access Control Upgrade
Renovation
Results
$116,595 CJ est. value
College Park, GA 30337

RFP D/B - Bryan Park
Renovation
Post-Bid
$68,300 CJ est. value
Atlanta, GA 30344

Outdoor Basketball Court
Renovation, Infrastructure
Results
$289,132 CJ est. value
College Park, GA 30337

Intersection Improvements at Various Locations
Infrastructure
Post-Bid
$4,103,225 CJ est. value
Atlanta, GA 30309

Annual Contract Asphaltic Concrete Pavement Milling & Resurfacing
Infrastructure
Results
$7,088,662 CJ est. value
Atlanta, GA 30334

Enon Road Over Camp Creek Tributary Road Improvement Project
Infrastructure
Post-Bid
$600,000 CJ est. value
South Fulton, GA 30331

Last Updated 10/09/2023 11:03 AM
Project Title

Sidewalk Connection Project

Physical Address View project details and contacts
City, State (County) Milton, GA 30004   (Fulton County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $542,154 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of october 09,2023, project was awarded to Blount Construction Company Inc, awarded amount is $542,153.74.** Reference Number 0000323014 The City of Milton is requesting bids from interested parties to perform construction services completing concrete sidewalk installation and asphalt paving . To bid on this contract, the Contractor must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list. No exceptions. All qualified bids will receive consideration without regard to age, handicap, religion, creed or belief, political affiliation, race, color, sex, or national origin. The City of Milton reserves the right to reject any or all bid/proposals and to waive technicalities and informalities, and to make award in the best interest of the City of Milton. Question Acceptance Deadline 06/23/2023 05:00 PM EDT PROJECT SPECIFICATIONS 1. To bid on this contract, the Contractor must be listed on the current Georgia Department of Transportation Pre-Qualified Contractors list. No exceptions. 2. The Contractor shall comply with the details and specifications for this project. In addition to other standard specifications referenced herein, the bid package includes: a. Special Provision 163 - Miscellaneous Erosion Control Items; b. Special Provision 165 - Maintenance of Temporary Erosion and Sedimentation Control Devices; c. Special Provision 171 - Silt Fence; d. Special Provision 700 - Grassing. 3. Where contract documents reference "the Department" or "GA Department of Transportation" or "the Engineer", it shall also mean "City of Milton." 4. All traffic control measures, and signage are the responsibility of the Contractor. Contractor shall coordinate all work with the City of Milton. 5. Replace, in kind, any vegetation or landscaping damaged during construction. Include cost in the price bid. Final stabilization will be sod and pine straw as called out in the bid documents. 6. Unless otherwise directed, all work performed under this contract shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition), and Special Provisions modifying them, except as noted herein

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents