Similar Projects
Washington Street Resurfacing and Stormwater Improvements
Post-Bid
Freeport, FL 32439

Douglass Crossroads/Knox Hill Road Improvements
Post-Bid
DeFuniak Springs, FL 32435

Drainage Repairs
Results
Less than $225,000 est. value

Drainage
Results
Less than $1,387,468 est. value
FL

Walton County Middle School Retaining Wall
Post-Bid
DeFuniak Springs, FL 32435

Sea Croft Drive Improvements
Results
De Funiak Springs, FL 32433

CR 883 Improvement Project
Results
Less than $1,526,499 est. value
De Funiak Springs, FL 32433

Western Lake Phase I Drainage Improvements
Results
De Funiak Springs, FL 32433

Mack Bayou Road Drainage Improvements
Results
De Funiak Springs, FL 32433

Southbound Right Turn Lane CR283
Results
Less than $355,130 est. value
De Funiak Springs, FL 32433

Hot Plant Bituminous Courses
Results
Less than $217,000 est. value
FL

Drainage
Results
Less than $300,000 est. value

Grassing, Seeding, Sodding
Results
Less than $500,000 est. value

Safety Project/Milling and Resurfacing/Drainage Improvements
Results
Less than $2,569,909 est. value
FL

Drainage
Results
Less than $200,000 est. value

Last Updated 04/30/2021 10:03 AM
Project Title

Eve Circle Roadway & Drainage Improvements

Physical Address View project details and contacts
City, State (County) De Funiak Springs, FL 32433   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $958,151
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes re-grading and paving the existing roadway, constructing two (2) ten (10) foot lanes with a reverse crown typical section. An exfiltration trench with pipe and inlets will be constructed along the centerline of the proposed paved roadway; and outfall construction to include an in-line check valve, ditch work and a stabilized path for ditch maintenance. Additional work on the project includes maintenance of traffic, clearing and grubbing, erosion control and sodding. Careful coordination with utilities is required. Eve Circle will have one lane of traffic open at all times.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents