Similar Projects
EROS Construction Services: Generator Upgrades
Term Contract
Bidding
$250,000 to $500,000 est. value
Sioux Falls, SD

Exterior Walk-in Freezer-Cooler Combination
Post-Bid
Custer, SD 57730

Kitchen's Walk-in Cooler and Freezer
Post-Bid
Castlewood, SD

044--Boiler Plant Safety Device Testing and Tank Inspections
Results
Sioux Falls, SD 57105

Hot Water Boiler - Washington Pavilion
Results
$240,000 est. value
Sioux Falls, SD 57104

Boiler Replacement at North Park Elementary School
Post-Bid
Belle Fourche, SD 57717

Spearfish Middle School Mechanical Upgrades Phase 1
Results
$900,150 est. value
Spearfish, SD 57783

Removal and Disposal of Existing Boilers
Post-Bid
Spearfish, SD 57783

Wintrode Student Center - Boiler Replacement
Alteration
Results
Brookings, SD 57006

Chiller Replacement
Alteration
Post-Bid
Mitchell, SD 57301

Boiler Tank Cleaning for Cheyenne Eagle Butte School
Term Contract
Results
Eagle Butte, SD 57625

Briggs Library Replace Boiler and Chiller
Alteration
Post-Bid
Brookings, SD 57007

Digester Boiler Replacement
Alteration
Results
$200,000 est. value
Rapid City, SD

Plumbing, Domestic Water and Light Commercial Heating Systems Service
Term Contract
Post-Bid
Box Elder, Spearfish, SD 57719

Orpheum Building Cooling System Replacements
Alteration
Results
$280,000 est. value
Sioux Falls, SD 57104

Last Updated 03/28/2022 04:07 PM
Project Title

Trane Chiller Replacement

Physical Address View project details and contacts
City, State (County) Milbank, SD 57252   (Grant County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,000 to $120,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reclamation of the R-22 refrigerant to be stored in reclaim drums and to become the property of the City of Milbank; removal and disposal of the existing chiller; setting of the new chiller including crane fees; new copper pipe outdoors to connect to the new chiller; new vibration eliminators; new butterfly isolation valves; new gauges, temperature sensors, and wells; flanges needed for butterfly valves and chiller evaporator connections; temperature and pressure gauges; wells and saddle clamps needed for sensors and pressure gauges; bracketing materials for piping; new insulation and PVC wrap to protect the insulation from weather as needed; control integration and bracket connection to the chiller; labor and freight.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents