Similar Projects
Last Updated | 04/15/2021 05:07 AM |
Project Title | Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris |
Physical Address | View project details and contacts |
City, State (County) | Saratoga Springs, UT (Utah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Schedule A: The construction of a concrete-lined 10 AC-FT irrigation pond and pressurized irrigation pipeline. Construction includes associated piping, overflow channel, site drainage channel, inlet and outlet vaults, collection basin, and drainage piping. Schedule B: The construction of a 19.3 AC-FT earth-fill debris basin, spillway, outlet structure, and outfall storm drain pipeline. Construction includes earthwork (cut/fill), embankment construction, cast-in place concrete, metalwork, storm drain piping, riprap placement, and incidental landscaping and reseeding. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |