Similar Projects
Main Dunstable Road/Buckmeadow Road Improvements - City of Nashua
Infrastructure, Alteration
Conception
$800,000 est. value
Nashua, NH 03062

Taylor Falls and Veternas Bridges Deck Rehabilitation - City of Nashua
Alteration
Conception
$1,350,000 est. value
Nashua, NH 03064

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Bio-Swales and Bioretention Installation
New Construction
Post-Bid
Meredith, NH

Portsmouth Christian Academy Drainage & Site Improvements
Renovation
Post-Bid
Dover, NH 03820

Site Improvements and MOV Canopy Construction
Infrastructure
Results
$960,000 est. value
Hillsboro, NH 03244

Amanda Howard Park Playground Site Preparation
Infrastructure
Results
Dover, NH 03820

Building Cluster 5, Stormwater Management Improvements 1000 Hilltop Place
Construction
New London, NH 03257

Nansen Ski Jump - Sitework
New Construction
Construction
Milan, NH 03588

Novo Nordisk Compressed Natural Gas Facility and Site Improvements
New Construction
Pending Verification
Lebanon, NH 03784

Improvement of a Section of The Conway Recreation Path
Post-Bid
Conway, NH 03860

Manchester-Boston Regional Airport Cargo Facility Site Preparation and Hangar 6 and 7 Building Demolition
Infrastructure
Results
$1,721,450 est. value
Manchester, NH

Sitework for 2 Retail Buildings
New Construction - 11,225 SF
Construction
Epping, NH 03042

As-Needed Earthwork Repair Services
Term Contract
Post-Bid
Laconia, NH

Lebanon High School Track Improvements Project Contract 1 (Sitework)
Renovation, Infrastructure
Results
Lebanon, NH 03766

Last Updated 06/15/2022 03:52 PM
Project Title

Canal/Franklin/Main Street Intersection Improvements - City of Nashua

Physical Address View project details and contacts
City, State (County) Nashua, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Railroad Square and Library Hill area of Nashua is one of the most congested in the City. A traffic study has suggested that traffic flow could be improved by turning Lowell Street and the portion of Canal Street west of Lowell Street into one-way streets whereby each street would complement the other. Some changes to the striping of Main Street in this area would also be performed. This requested amount is for preliminary design local match only. This project is in included in the City of Nashua - Planning FY 2023 - 2028 Capital Improvement Plan (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents