Similar Projects
The Optimist Apartments
New Construction, Renovation
Conception
Saint Louis, MO 63108

Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Geyer Avenue Townhome Development
New Construction
Design
$750,000 est. value
Saint Louis, MO 63104

Moxy Hotel by Marriott / Saint Louis
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Saint Louis, MO 63101

Bennington Place-McKelvey Road-Ameling Road Resurfacing - 1680 - St. Louis County
Infrastructure
Bidding
$216,400 CJ est. value
Saint Louis, MO 63103

Bennington Place-McKelvey Road-Ameling Road Resurfacing - 1680 - St. Louis County
Infrastructure
Bidding
$216,400 CJ est. value
Saint Louis, MO 63103

Baden School Apartments
Renovation
Sub-Bidding
$1,700,000 CJ est. value
Saint Louis, MO 63147

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Cortex Apartments Podium
New Construction, Renovation
Post-Bid
MO 63110

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Results
$711,651,970 CJ est. value
Saint Louis, MO 63107

Walmart Supercenter #2213-238 - DOF-2
Renovation - 250 SF
Construction
Saint Louis, MO 63125

Walmart Supercenter #1265-227 - Entertainment Optimization
Renovation - 92,786 SF
Construction
Saint Louis, MO 63136

High End Apartments
Renovation
Pending Verification
Saint Louis, MO 63104

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

Last Updated 04/25/2023 02:32 PM
Project Title

Gateway South Redevelopment

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63102   (Saint Louis City County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Industrial/Manufacturing, Residential
Sub-Category(s) Apartments/Condominiums, Manufacturing/Processing Plant, Misc. Recreational, Office, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Schematic Drawings, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $1,200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving, outdoor lighting, new construction and remodeling of a mixed-use development in Saint Louis, Missouri. Design plans call for the construction of a multi-residential development; recreation facility; for the remodel of a industrial development; office development; and retail development. On November 15, 2022, the Land Clearance for Redevelopment Authority of the City of St. Louis declared the region blighted. On February 3, 2023, the St. Louis Board of Aldermen voted to approve incentives to the project that would allow up to 15 years of property tax abatement, starting with 10 years based on 90% of the assessed value of incremental improvements, followed by five years based on 50%. As of April 25, 2023, the project is in conceptual design. Master Planning has not started. An architect has been selected. Information regarding the selection of a general contractor has not been disclosed. A firm construction timeline has not been determined; however, once it has been announced, it is expected to last until the 2030s.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents