Similar Projects
Springwells Water Treatment Plant, Administration Building Improvements & Underground Fire Protection Loop - 114005 - Great Lakes Water Authority
Renovation
Conception
$6,591,000 CJ est. value
Dearborn, MI 48126

Construction Engineering Services for Eureka Road (Toledo Road to Ford/M-85)
Infrastructure
Conception
$1,000,000 CJ est. value
Taylor, MI 48180

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Benjamin Davis Veterans Village Apartments
New Construction, Infrastructure - 48,577 SF
Sub-Bidding
$16,000,000 CJ est. value
Detroit, MI 48234

Senior Center Parking Lot Replacement
Infrastructure
Post-Bid
$176,520 CJ est. value
Rockwood, MI 48173

North Service Center Pumping Station Improvements - Great Lakes Water Authority
Demolition, Renovation, Infrastructure
Post-Bid
$72,216,000 CJ est. value
West Bloomfield, MI 48323

Springwells Water Treatment Plant Medium Voltage Electrical System Replacement
Renovation
Results
$64,457,860 CJ est. value
Dearborn, MI 48126

Pipe Hanger Replacement At Hubbell - Southfield CSO Facility
Renovation, Alteration
Results
Detroit, MI

The Perennial Corktown
New Construction, Infrastructure - 2,236 SF
Construction
$78,200,000 CJ est. value
Detroit, MI 48216

Eastland Center Redevelopment / Vernier Road Industrial Complex
Demolition, New Construction, Infrastructure - 514,000 SF
Construction
$94,200,000 CJ est. value
Harper Woods, MI 48225

University of Michigan Center for Innovation
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48204

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Tireman Road and Greenfield Road - 30-420 - Dearborn
Infrastructure
Conception
$500,000 CJ est. value
Dearborn, MI 48126

Jay Kay Industrial Building
New Construction, Infrastructure - 70,000 SF
Design
$20,000,000 CJ est. value
Romulus, MI 48174

Last Updated 05/15/2023 06:34 AM
Project Title

Water Treatment Plant Demolition

Physical Address View project details and contacts
City, State (County) Trenton, MI 48183   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000316436 Questions are submitted online No Closing Date 05/09/2023 10:00 AM EDT Contact Information Kevin Sargent 7346758470 ksargent@trenton-mi.com Souheil Sabak 734-285-7510 ssabak@charlesraines.com General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % The purpose of the asbestos survey was to verify and quantify, to the extent possible, friable and non-friable asbestos containing building materials (ACBM). The results of the asbestos study are needed for the planned building demolition activities in accordance with current EPA 40 CFR Part 61 of the Federal Register, Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) revision; final rule effective November 20, 1990. For the purpose of this report and as defined by EPA regulations, a friable material is one which can be crushed, crumbled, pulverized, or reduced to powder by hand pressure when dry.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents