Last Updated | 11/23/2022 05:34 PM |
Project Title | ORG 182-Herbert Marcus Leadership Academy - Addition and Renovation |
Physical Address | View project details and contacts |
City, State (County) | Dallas, TX 75229 (Dallas County) |
Category(s) | Education, Heavy and Highway, Sewer and Water |
Sub-Category(s) | Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $37,863,857 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of a new 2-story building addition totaling 77,703 square feet as well as the construction of a storm shelter of 8,441 square feet. These structures are being added to the existing Area D, which is a 2-story building totaling 26,457 square feet and will be renovated as part of this project. Once the new additions and renovations are copleted, the remaining portions of the old school will be abated and demolished, which is also part of this work. Project Number:- J182 P0108 1 Question Deadline 09/16/2022 A. Removal of existing portable classroom buildings B. Site preparation at location of a new classroom building addition, includes but is not limited to excavation, grading, site utilities, storm drainage system, and site paving. C. Construction of a two-story classroom addition D. Renovation of Existing Classroom Building E. Asbestos Abatement and Demolition of Existing Building F. Completion of Sitework Total Estimated Construction Budget (CCL + Allowances) for CSPCS 206946 $29,216,642.00 Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, 10/12/2022 at 2:00 PM (local time). Completed CSP Package Part 2 is due on Thursday, 10/13/2022 at 3:00 PM (local time). Addendum #1 has been issued as of 10-3-2022. Note from Sedalco Construction: Alternates are as follows, and affected bidders are requested to provide pricing for all alternates containing their scope(s) of work: 1. New VAV boxes (15 ea) per Note 1 on M2.1D and M2.02D at existing classroom wing Levels 1 and 2. 2. Replace coils at exisiting fan power boxes (15 ea) with new higher capacity hot water coils and provide new controls/thermostats for existing fan power boxes. Refer to keyed note 1 on sheet M2.01D and M2.02D. 3. Replace ceiling grid and acoustical tile with ACP-1 in rooms 141, 143-146, 148, 156, 157, ST4.1, ST5.1, 228-230, 230A, and 231-234. 4. Add window security film at Secured Lobby H1A where indicated on drawings 5. Add window security film at Secured Vestibule H8-A where indicated on drawings |
||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, Addition, Addition.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |