Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Clearing and Grubbing for Black Oak Phase 2
Infrastructure
Post-Bid

Water, Sanitary and Drainage Facilities in Harper`s Preserve Sections 20-A & 20-C
Infrastructure
Post-Bid
Conroe, TX 77303

Construction of Water, Sanitary, Drainage and Paving Facilities for Audubon Creekside North Sec. 1
Results
$1,000,000 est. value
Montgomery, TX

Construction of Water, Sanitary, Drainage and Paving Facilities for Audubon Creekside North Sec. 1
Results
$1,000,000 est. value
Montgomery, TX

Paving and Appurtenances Cliffstone Hills Section 1
Alteration
Post-Bid
Conroe, TX

Stanley Lake Waterline Extension
Results
Montgomery, TX 77356

IH0045 - Hot Mix
Infrastructure
Post-Bid
$294,500 est. value
TX

ESD Waterline Extension
Results
$50,000 est. value
Conroe, Tamina, TX 77301

Paving Improvements for the Lakes at Clovercreek Replat No. 2
Infrastructure
Post-Bid
TX

Water Improvements for Highlands Water Line Extension to Cumberland Boulevard
Results
TX

Caney Mills Phase 3 Clearing and Grubbing
Infrastructure
Post-Bid
TX

Paving Improvements to Serve Roman Forest Section 4 Phase I
Results
Roman Forest, TX

Clearing And Grubbing In Stonebrooke Sections 1 & 2
Alteration
Post-Bid
$518,960 est. value
TX

Last Updated 08/06/2022 08:39 AM
Project Title

Public Roads, Utilities and Storm Drainage, Proposed Traffic Signal Installations at Heritage Lane & Community Road to Serve Magnolia Village Retail Center

Physical Address View project details and contacts
City, State (County) Magnolia, TX 77355   (Montgomery County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $4,994,115 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract includes the following: Construction of the Public roads, Water, Sanitary Sewer, and Storm drainage to serve Magnolia Village Retail Center. In addition, the installation of Traffic signal at Heritage Road and at Community Road along FM 1488. Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within twenty-four (24) hours of receipt of the bid opening. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature, as defined by and in accordance with Owner's Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents