Similar Projects
Last Updated | 05/05/2023 08:38 AM |
Project Title | High Trestle Trail Extension - Magazine to Oralabor - SDW-16-001 - City of Ankeny |
Physical Address | View project details and contacts |
City, State (County) | Ankeny, IA 50023 (Polk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,750,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | https://www.ankenyiowa.gov/home/showpublisheddocument/9561/637448267938070000 The construction of 1.65 miles of 10' PCC recreation trail along the High Trestle Trail corridor from SE Magazine Road to SE Oralabor Road. The project will include an overpass of SE Oralabor Road. Project is included City of Ankeny FY 2021-2025 CIP Page 83 ___________________________________________________________ https://www.ankenyiowa.gov/home/showpublisheddocument/9561/637448267938070000 The construction of 1.65 miles of 10' PCC recreation trail along the High Trestle Trail corridor from SE Magazine Road to SE Oralabor Road. The project will include an overpass of SE Oralabor Road. Project is included City of Ankeny FY 2021-2025 Page 83 _______________________________________________________________________________________________________________________ The construction of 1.65 miles of 10' PCC recreation trail along the High Trestle Trail corridor from SE Magazine Road to SE Oralabor Road. The project will include an overpass of SE Oralabor Road. The extension of the trail is proposed in two phases. The trail is currently being extended from its current terminus at Ordnance Road southeast to Magazine Road. Phase I includes a tunnel under Highway 69 and is on schedule to be completed in 2020, with surface restoration completed in spring 2021. Phase 2 will consist of the trail's extension from SE Magazine Road to a direct connection with the Gay Lea Wilson Trail located on the south side of SE Oralabor Road/Highway 160. The project will include a grade separated crossing (specifically an overpass) to navigate trail users over the high traffic volumes experienced on SE Oralabor Road/Highway 160. Currently, $1,000,000 has been secured in external funding for Phase 2 through the Des Moines Area MPO Transportation Alternatives Program and State Recreational Trails Project Funding. It is assumed that the project will receive an additional $200,000 in U-STEP funding from the Iowa DOT. The project is included in the city's 2021-2025 Capital Improvement Program (CIP). As of March 22, 2021, the project is currently being designed and is scheduled for bid letting on June 15, 2021. As of May 5, 2023, no new information available at this time |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |