Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Results
West Des Moines, IA 50266

South Grand Prairie Parkway - Stagecoach Drive to Grand Avenue
Infrastructure
Results
WDM, IA 50266

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Last Updated 05/05/2023 08:38 AM
Project Title

High Trestle Trail Extension - Magazine to Oralabor - SDW-16-001 - City of Ankeny

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50023   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.ankenyiowa.gov/home/showpublisheddocument/9561/637448267938070000 The construction of 1.65 miles of 10' PCC recreation trail along the High Trestle Trail corridor from SE Magazine Road to SE Oralabor Road. The project will include an overpass of SE Oralabor Road. Project is included City of Ankeny FY 2021-2025 CIP Page 83 ___________________________________________________________ https://www.ankenyiowa.gov/home/showpublisheddocument/9561/637448267938070000 The construction of 1.65 miles of 10' PCC recreation trail along the High Trestle Trail corridor from SE Magazine Road to SE Oralabor Road. The project will include an overpass of SE Oralabor Road. Project is included City of Ankeny FY 2021-2025 Page 83 _______________________________________________________________________________________________________________________ The construction of 1.65 miles of 10' PCC recreation trail along the High Trestle Trail corridor from SE Magazine Road to SE Oralabor Road. The project will include an overpass of SE Oralabor Road. The extension of the trail is proposed in two phases. The trail is currently being extended from its current terminus at Ordnance Road southeast to Magazine Road. Phase I includes a tunnel under Highway 69 and is on schedule to be completed in 2020, with surface restoration completed in spring 2021. Phase 2 will consist of the trail's extension from SE Magazine Road to a direct connection with the Gay Lea Wilson Trail located on the south side of SE Oralabor Road/Highway 160. The project will include a grade separated crossing (specifically an overpass) to navigate trail users over the high traffic volumes experienced on SE Oralabor Road/Highway 160. Currently, $1,000,000 has been secured in external funding for Phase 2 through the Des Moines Area MPO Transportation Alternatives Program and State Recreational Trails Project Funding. It is assumed that the project will receive an additional $200,000 in U-STEP funding from the Iowa DOT. The project is included in the city's 2021-2025 Capital Improvement Program (CIP). As of March 22, 2021, the project is currently being designed and is scheduled for bid letting on June 15, 2021. As of May 5, 2023, no new information available at this time

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents