Similar Projects
Drilling a New Well at Cleveland Town Hall
Infrastructure
Bidding
$300,000 CJ est. value
Cleveland, WI 53015

Hot Mix Paving
Post-Bid
Reedsville, WI 54230

Pavement Repair
Post-Bid
Cleveland, WI 53015

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Concrete Paving I and Concrete Slab Replacement
Results
Manitowoc, WI

NOI RFP Engineering - Green Bay - Manitowoc
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Reedsville, WI 54230

NOI RFP Engineering - Green Bay - Manitowoc
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Reedsville, WI 54230

Pulverizing Chip Sealing
Post-Bid
WI

Asphaltic Concrete Paving
Results
Manitowoc, WI 54220

Hot Mix Resurfacing (Overlay) on Asphalt Pavement of Wagon Wheel Road
Post-Bid
Manitowoc, WI 54220

Concrete Paving III (South 30th Street Reconstruction)
Results
Manitowoc, WI 54220

Sealcoat and Wedging
Infrastructure
Post-Bid
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Chip Seal Surfacing with 3/8” Granite
Infrastructure
Post-Bid
Cleveland, WI

North 8th Street and Maritime Drive Intersection Improvements
Results
Manitowoc, WI 54220

Last Updated 08/04/2022 06:01 AM
Project Title

Two Rivers - Kewaunee Const Ops / Cold10 / HSIP

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Two Rivers - Kewaunee 34th Street-ncl Const Ops / Cold10 / Hsip Safety (Regular Hsip) State 3r Estimate Anticipated Funding $7,000,000 - $7,999,999 As of August 04, 2022, the project is in Conceptual status. Anticipated letting date is December 13, 2022. WisDOT - Two Rivers - Kewaunee Const Ops / Cold10 / HSIP *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents