Similar Projects
Northstar Boulevard - Tall Cedars Parkway to Braddock Road - C02375 - Loudoun County
Infrastructure
Conception
$32,895,000 CJ est. value
Ashburn, VA 20148

United States Tennis Association Mid-Atlantic HQ / Village at Clear Springs
New Construction, Infrastructure - 190,000 SF
Conception
$42,000,000 CJ est. value
Leesburg, VA 20175

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

One Gramercy and Two Gramercy / Loudoun Station Phase 2
New Construction, Infrastructure - 262,000 SF
Design
$75,000,000 CJ est. value
Ashburn, VA 20147

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Hall Avenue and O Street 6" Water Main Replacement
Infrastructure
Results
Purcellville, VA

Cattail Branch Sewer Pump Station (SPS) Upgrade - Phase III
Renovation
Results
Leesburg, VA

Dulles Town Center Atlantic Boulevard Trail
New Construction - 3,580 SF
Construction
$1,500,000 est. value
Sterling, VA 20166

Montebello Farms Residentail Development - Phase 2
New Construction, Infrastructure
Construction
$46,000,000 CJ est. value
Sterling, VA 20164

Westwind Drive - State Street to Ladbrook Drive - Loudoun County
Infrastructure
Pending Verification
$51,301,000 CJ est. value
Dulles, VA 20148

Silver District West Mixed-Use / Landbay O & N
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Dulles, VA 20166

Fire and Rescue Training Academy Expansion - Loudoun County
Addition, Demolition, Renovation, Infrastructure - 22,000 SF
Conception
$16,097,000 CJ est. value
Leesburg, VA 20175

Innovation Multifamily
New Construction, Infrastructure - 1,850 SF
Design
$135,000,000 CJ est. value
Leesburg, VA 20176

Last Updated 02/22/2023 11:33 AM
Project Title

Sewer Line Gasket Removal

Physical Address View project details and contacts
City, State (County) Ashburn, VA 20147   (Loudoun County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $245,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Loudoun County Sanitation Authority (DBA Loudoun Water), the Owner, invites qualified contractors to submit Quotes for the aforementioned project. The procurement process and the performance of the Contract shall be governed by the provisions of the Virginia Public Procurement Act (VPPA). The purpose of this Request for Quote is to solicit Quotes to establish an agreement for the removal and capture of gasket-like material from sewer pipe in a portion of the S-61, PIP sewer. The map area (attached in IonWave) represents approximately thirty-four hundred (3,400) linear feet of forty-two (42) inch-diameter pipe located in Loudoun County, Virginia The purpose of this project is to remove and capture loose, hanging gasket-like material from the inside of a forty-two (42") inch diameter concrete sewer pipe located in the yellow shaded area on the attached map. The material was installed at each joint and parged over to provide another layer of corrosion protection to the joint. Over time the parging material has deteriorated and is no longer holding the gasket-like material in place. Overall, the project consists of approximately thirty-four hundred (3,400) feet and sixty-five (65) gaskets. A MSI inspection was conducted in 2020 and the CCTV video and reports are available for your use. Average flow within this sewer is approximately 1.0-1.2 MGD including one pump station that contributes approximately 0.14 MGD. The pump station is located approximately twenty-one thousand (21,000) feet upstream from this Work location. The successful contractor will include all Work required to mobilize, conduct material removal, demobilize, restore properties affected by the work to like condition prior to Work, and provide post removal closed-circuit television video (CCTV). Condition assessment data shall be provided to Loudoun Water electronically in conformance with the National Association of Sewer Services Companies (NASSCO) Pipeline Assessment Certification Program (PACP) Version 7 guidelines. This file shall be exported as a NASSCO PACP V7 database. Video files supporting the inspection shall be exported as mp4 files. The successful contractor will provide all labor, materials, tools, equipment, and incidentals as needed, specified, and required to execute the Work, which includes, closed-circuit television (CCTV) inspection. It is preferred the Work be conducted during normal business hours, however, if high flows are observed, non-peak hour work may be permitted to obtain the necessary result. If any unforeseen blockage within the pipe interrupts the Work, the Owner must be notified immediately. If the successful contractor determines that maintenance of traffic plans is necessary to complete this work, the successful contractor is responsible for submitting and obtaining all applicable Virginia Department of Transportation (VDOT) permits including traffic safety equipment and traffic control. Loudoun Water will provide all necessary notifications to the public and private landowners to gain access to these structures. The overall period of the project is estimated to be one (1) to two (2) weeks. Loudoun Water, in its sole discretion, shall determine if the additional work is needed and notify the successful contractor. The process to be used to complete the project is at the discretion of the contractor (e.g.: removal of the material via "man-entry" or robotically removing the materials). Any interested bidders shall submit a work plan Electronically containing details of the process that they will use to complete the work as specified above. A cost breakdown of the lump sum given Electronically shall include but not be limited to hourly labor rates, equipment to be used, equipment fees, shipping and handling charges and any other fees associated with completing the project. This breakdown shall be included in the work plan. The work plan will be a factor in the award of the contract. There shall be no pre-bid conference for this project. Question Cuttoff Date & Time 9/9/2022 12:00:00 PM (ET) Questions concerning this solicitation must be directed to the Procurement Official at KBodden@loudounwater.org and must be received at least (2) two business days prior to the Quote due date. Any changes resulting from inquiries shall be issued by a written addendum from the Procurement Department Any Quote in response to this solicitation shall be valid for (120) one hundred and twenty days. At the end of the (120) one-hundred-and-twenty-day period the Quote may be withdrawn at the written request of the Contractor. If the Quote is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents