Similar Projects
ServiceMaster at Southwood
New Construction - 18,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Tallahassee, FL 32311

Tennessee Street Self Storage
New Construction - 95,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Tallahassee, FL 32304

Florida State University Collins Research Building Exhaust Fan Addition for Particle Accelerator
Renovation
Bidding
$200,000 est. value
Tallahassee, FL 32304

Construction Management at Risk Services for TCC Ghazvini Patio Solar Panel System
Renovation, Alteration
Bidding
FL 32308

Engineering Building
New Construction
Post-Bid
$60,000,000 est. value

Engineering Building
New Construction
Post-Bid
$60,000,000 est. value

Construction Managers
Results
Tallahassee, FL

Continuing Services Contract to Provide Minor Construction Management (CM) Services
Renovation
Results
Less than $200,000 est. value

FSUS Steam Hardening & Building
Construction
Less than $17,000,000 est. value
Tallahassee, FL

Sliger 0804 Data Center Renovation
Renovation
Construction
Tallahassee, FL

BIT Building Classroom Remodels
Renovation
Conception
$11,035,743 est. value
Tallahassee, FL 32304

North Florida Innovation Labs
New Construction - 40,000 SF
Post-Bid
$10,200,000 est. value
Tallahassee, FL 32310

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Results
Lakeland, FL 33868

Independence Landing
New Construction - 8,000 SF
Construction
$8,027,712 est. value
Tallahassee, FL

Central Utility Plant Renovation
Renovation
Conception
$10,913,099 est. value
Tallahassee, FL 32304

Reported 05/03/2022 12:00 AM
Project Title

Construction Managers - Football Operations Facility

Physical Address View project details and contacts
City, State (County) Tallahassee, FL   (Leon County)
Category(s) Commercial, Education, Entertainment/Recreation, Green Building
Sub-Category(s) Athletic Facility, College/University, LEED Certified, Office
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Football Operations Facility, Florida State University, Tallahassee, Florida The new FSU Football Operations Facility will be located on the main FSU Campus adjacent to the Indoor Practice Facility (IPF) in the Athletic complex.  This new facility will provide space for football operations and include a variety of specialized spaces for football including team segment/position rooms, team meeting rooms, locker rooms, an equipment area, a nutrition area, a hydrotherapy area, trophy/display areas, player’s lounge, coaches’ offices/meeting rooms, conditioning areas, and a new weight room that will connect to the existing IPF and other gameday and support spaces.  The project will also include exterior site work that includes hardscape/plazas, parking adjustments, and any practice field repair/replacement work that is required. The design is being developed by Populous, Kansas City, Missouri and the program will add approximately 150,000 gsf of new space. It is expected that the football department will remain functional during the project and temporary accommodations may need to be made including phasing. Renovation/remodeling to other existing and related athletic venues, such as the Moore Center when vacated, may be added if funding should become available. The selected construction manager, at the discretion of the University, may be contracted for this work as well. LEED Silver Certification (v.4) by the USGBC will be sought. The estimated project budget is $90,000,000, and the construction budget is approximately $70,000,000.

Details

Office, New Construction, College/University, New Construction, Athletic Facility, 150,000 SF New Construction, LEED Certified, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents