Similar Projects
Last Updated | 08/17/2023 11:03 AM |
Project Title | Hot Mix Asphalt |
Physical Address | View project details and contacts |
City, State (County) | Solon Springs, WI 54873 (Douglas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Village Board of Solon Springs, Douglas County, WI is accepting Hot Mix Asphalt bids for an LRIP funded project to construct and pave the following: Baldwin Avenue from Old Business 53 to New State Highway 53 Approx. Area: 3,553 ft by 27 ft 1. Mill/Profile the existing blacktop (approx. one inch) for surface correction 2. Broom and Sweep the milled surface to prepare it for paving 3. Adjust the Utilities, mill pavement joints at intersections 4. Tack, Pave/Scratch a 3/4 inch leveling course of asphalt for leveling 5. Pave a surface course with hot mix asphalt to an average compacted thickness of 1.75 inches 6. Stripe approx. 6800 ft 7. Construct a gravel shoulder 8. Provide all traffic control The project is to bid using a unit price per ton of asphalt made from an approved WDOT mix design. The Village of Solon Springs reserves the right to reject any or all bids. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |