Reported | 07/18/2022 04:49 PM |
Project Title | Holyoke- Bridge Replacements, H-21-014, Route 141 (Appleton Street) Over Second Level Canal & H-21-020 Over First Level Canal |
Physical Address | View project details and contacts |
City, State (County) | Holyoke, MA 01040 (Hampden County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Schematic Drawings, Construction Start Expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $9,130,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project involves replacing two bridges on Route 141 (Appleton Street) where the bridges cross over the First Level and Second Level Canals. The new bridges will be two-span concrete bridges supported by abutments that will be constructed behind the existing canal walls. The existing roadway and sidewalk widths will be maintained. A decorative bridge rail will be installed that is compatible with the proposed Holyoke Canalwalk and the historic character of the area. This requires that a roadway curb rail be used to separate the roadway from the sidewalk and pedestrian rails as the proposed bridge rail is not a crash tested acceptable design. As of July 8, 2022, further derails regarding design and construction timelines have not been identified. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |