Similar Projects
St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14
Term Contract
Design
$1,000,000 to $5,000,000 est. value

St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14
Term Contract
Design
$1,000,000 to $5,000,000 est. value

Gabion Mattresses Installation
Infrastructure
Bidding
$750,000 est. value

Ditch Maintenance
Infrastructure
Bidding
$200,000 est. value

Walton County Middle School Retaining Wall
Post-Bid
DeFuniak Springs, FL 32435

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Drainage
Results
Less than $1,387,468 est. value
FL

NRDA Artificial Reef Construction 2019-20 Deployment FWC Grant 19021
Results
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage
Results
Less than $300,000 est. value

Washington County - Joiner Road Culvert Replacement
Infrastructure
Post-Bid
Chipley, FL 32428

Drainage
Results
Less than $400,000 est. value

Grading
Results
Less than $140,000 est. value
FL

Drainage
Results
Less than $250,000 est. value

Grading
Results
Less than $250,000 est. value
Caryville, FL 32427

Last Updated 10/18/2021 05:29 AM
Project Title

Installation of Gabion Mattresses - Ponce De Leon Maintenance - Gabion Mattresses Maintenance

Physical Address View project details and contacts
City, State (County) (Holmes, Walton, Washington Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Improvements within this Work Document Driven-Contract consist of the installation of Gabion Mattresses for ditch and slope refurbishment in Holmes, Walton, and a portion of Washington Counties. Spoil material removed from ditches may be relocated to FDOT storage pit in Argyle, as directed by the Engineer. All Maintenance of Traffic, Mobilization, and Regular Excavation shall be paid for as incidental to the price of Gabion Mattresses. Section 0001 Sodding (Sy) 0104- 10- 3 Sediment Barrier Lf 300.000 0104- 11- Floating Turbidity Barrier Lf 150.000 0110- 4- 10 Removal Of Existing Concrete Sy 100.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 40.000 0121- 70- 2 Flowable Fill, Maintenance Contracts Only Cy 1.000 0530- 5- 11 Gabion, Mattress Less Than 1 Foot Thickness Sy 4,400.000 E110- 2- Clearing & Grubbing Ac 1.000 E575- 1- Sodding Sy 4,200.000 E577- 70- Shoulder Rework Sy 4,200.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents