Similar Projects
Hamilton Correctional Center Wastewater Treatment Plant
New Construction
Conception
$1,072,600 est. value
Hodgen, OK 74939

Water Treatment Facility Replacement
New Construction
Conception
$2,000,000 est. value
Braggs, OK 74423

Ozone System Expansion/Upgrades
Renovation
Bidding
$45,000,000 est. value
Oklahoma City, OK 73120

FY`22 Water Pollution Control Capital Equipment Replacements
Infrastructure
Bidding
Tulsa, OK 74107

Kaw Lake Water Supply Program - Solicitation Group 3.00
Infrastructure
Post-Bid
Enid, OK

Kaw Lake Water Supply Program
Infrastructure
Post-Bid
Enid, OK

54th Street Lift Station Capacity Improvement Program
New Construction
Results
Enid, OK 73701

Hefner Water Treatment Plant Lime System
Renovation
Results
Oklahoma City, OK 73102

Water Scada Improvements Project
Infrastructure
Bidding
Lawton, OK

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

Sewer Force Main Improvements - HDPE Pipe and Plug Valve
Infrastructure
Results
Moore, OK

Operation, Maintenance, & Management Of The Water & Wastewater Treatment Facilities
Infrastructure
Bidding
Mustang, OK

Guymon Lift Station 6 Replacement Project
Renovation
Post-Bid
Guymon, OK

Water Treatment Plant Improvements
Renovation
Results
Holdenville, OK

Kaw Lake Water Supply Program - Solicitation Group 6.00 - Chestnut Watermain
Infrastructure
Bidding
Enid, OK 73703

Last Updated 04/13/2022 09:17 AM
Project Title

Arcadia Lake Water Treatment Plant (ALWTP) Intake and Low Lift Pump Station - INT 01 Project

Physical Address View project details and contacts
City, State (County) Edmond, OK   (Oklahoma County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all required materials, supplies, equipment, tools, and plant to perform all necessary labor for the construction of the Arcadia Lake Water Treatment Plant (ALWTP) Intake and Low Lift Pump Station – INT-01 Project

Details

Water Treatment Plant, Renovation, Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents