Similar Projects
Indiana Harbor Confined Disposal Facility Dike Raise
Results
$10,000,000 to $25,000,000 est. value
Whiting, IN 46394

BL000A Crescent Steam Tunnel Repairs
Results
Bloomington, IN

Goshen Pond Dam Improvements
Renovation
Bidding
Goshen, IN

Tunnel T-12 Repairs 2021
Results
Terre Haute, IN

West Lafayette Campus Multiple Tunnels Infrastructure Repair 2020
Results
West Lafayette, IN 47907

Lake Deturk Dam Spillway Improvements Phase I
New Construction
Post-Bid
Martinsville, IN 46151

Dam Removal on Sugar Creek
Post-Bid
Crawfordsville, IN

Eagle Creek Dam Improvements Division A
Results
$1,100,000 to $1,500,000 est. value
Indianapolis, IN 46204

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

BL243 Teter Quad Tunnel Waterproofing
Renovation
Results
Bloomington, IN 47406

Last Updated 07/29/2021 09:56 AM
Project Title

Upper Wildwood Dam Rehabilitation

Physical Address View project details and contacts
City, State (County) Camby, IN   (Hendricks County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct dam with a new drop inlet spillway, concrete pipe and plunge pool outlet. Articulated concrete block mats will be used on about one-half of the dam.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents