Similar Projects
EHRM Infrastructure Upgrades Design-Build Martinez VA
Infrastructure
Design
$10,000,000 to $20,000,000 est. value
Martinez, CA 94553

Orinda Community Center Solar Battery Storage and Roof Replacement
Alteration
Post-Bid
$550,000 est. value
Orinda, CA 94563

San Ramon Electrical Upgrades
Alteration
Post-Bid
$1,200,000 est. value
San Ramon, CA 94583

Sheriffs Office Generator Replacement
Alteration
Results
$415,000 est. value
Martinez, CA 94553

Fire Station 2 and 81 Generator Replacements
Alteration
Results
$615,000 est. value
CA

Generator Testing Services
Alteration
Post-Bid
Concord, CA

On-Call Uninterrupted Power Supply (UPS) Maintenance and Repairs Services
Infrastructure
Post-Bid
Blackhawk, CA

On-Call Uninterrupted Power Supply (UPS) Maintenance and Repair Services
Term Contract
Post-Bid
$600,000 est. value
Martinez, CA

Emergency Generator Inspection and Repair Services
Term Contract
Post-Bid
N Richmond, CA 94801

Wayfinding Signs
Infrastructure
Post-Bid
$1,467,024 CJ est. value
Antioch, CA 94509

Electrical Conductor Replacement Project At Alhambra High School
Renovation
Post-Bid
$100,000 CJ est. value
Martinez, CA 94553

Electrical Infrastructure Hardening Phase 1
Renovation
Post-Bid
$500,000 CJ est. value
Blackhawk, CA 94506

E-Rate Year 26 (2023-2024) Network Electronics
Term Contract
Post-Bid
Antioch, CA 94509

Police Department Generator and Transfer Switch Replacement Project
Renovation
Post-Bid
$200,000 CJ est. value
Concord, CA 94520

Lights Light Bars and Wiring Installation Services
Term Contract
Post-Bid
Concord, CA 94520

Last Updated 05/15/2023 09:38 AM
Project Title

P.D. Generator & Transfer Switch Replacement Project

Physical Address View project details and contacts
City, State (County) Concord, CA 94520   (Contra Costa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 15,2023, no bids received. No definite date for the rebid.** The work to be done in general consists of complete removal and replacement of the existing emergency back-up generator and associated automatic transfer switch. Complete turnkey installation includes and is not limited to: removal and installation of new generator set, removal and installation of new automatic transfer switch, rental of a temporary generator set during the installation of the new generator set, connection of the temporary generator set; commission, testing, and startup of the new generator set; generator starting battery, freight; disposal of existing generator and automatic transfer switch; obtain construction and electrical permits and all associated costs; all scope of work associated as a result of the permitting process; assistance in air quality permitting. Question Deadline 05/04/2023 at 5:00 PM PT submit all questions to deyuanne.lei@cityofconcord.org

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents